Method for de-silting lake and constructing lake center island
A technology for lakes and lake centers, applied in lake dredging and construction fields, can solve problems such as water pollution, failure to deal with it in time, and secondary pollution, and achieve the effects of beautifying the environment, shortening the construction period, and controlling secondary pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Embodiment 1: In a lake in an urban area of a certain city, thick sludge is deposited at the bottom of the lake. Sludge contains a large amount of pollutants, and its pollution and resuspension are important causes of lake water pollution. Sludge silts up, the lake water deteriorates, the lake capacity shrinks, and the swamp becomes serious. We have to make up our minds to remediate it, but piling up sludge takes up land and pollutes the environment; transporting sludge slops with water and pollutes roads; sludge landfilling costs a lot of money and land, and sludge resource treatment is not easy. Many problems have been plaguing the governance of the lake.
[0023] The control scheme of the present invention includes stockyard selection, piling arrangement, embankment construction, dredging, pipeline mud transportation, dehydration and solidification, and planting slope protection. Use a vibratory hammer to drive a circle of piles that are interlocked and connected...
Embodiment 2
[0032] Example 2: A certain lake is the water source of a waterworks in a certain city. Due to the long-term natural erosion of the upstream water, the two sides of the river are constantly eroded, and the soil and water are lost. Over time, thicker and thicker mud layers are gradually deposited on the bottom of the lake . This not only raises the river bed, reduces the capacity of the lake, pollutes the environment, and affects traffic, but also floods during the flood season, endangering the embankment and causing floods. In previous dredging and dredging projects, the dredged silt was piled up by the lake, and the silt by the lake was returned to the lake when it rained. It was always cleared and silted, silted and cleared. Treatment projects often treat the symptoms but not the root cause, and the project efficiency is low.
[0033] The control scheme of the present invention is basically the same as embodiment 1, and it is characterized in that: the self-connecting sheet...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com