Unlock instant, AI-driven research and patent intelligence for your innovation.

Implementation process for scheduling production tasks in accordance with production capability gradually in production management process

A production task and production management technology, applied in data processing applications, instruments, resources, etc., can solve problems such as unbalanced resource production capacity, unpredictable delivery date and the impact of other tasks, and inability to change resources in a timely manner

Inactive Publication Date: 2009-07-08
INSPUR COMMON SOFTWARE
View PDF0 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] When erp management software schedules production tasks according to capacity, it is generally divided into limited capacity scheduling and unlimited capacity scheduling. Both limited capacity and unlimited capacity require one-time scheduling of production tasks according to the capacity that resources can provide. After scheduling, the production capacity of the originally occupied resources is often unbalanced due to task changes and abnormal conditions on the workshop site, and the resources cannot be changed in time or the impact on the delivery date and other tasks cannot be estimated after the resources are changed.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Implementation process for scheduling production tasks in accordance with production capability gradually in production management process
  • Implementation process for scheduling production tasks in accordance with production capability gradually in production management process
  • Implementation process for scheduling production tasks in accordance with production capability gradually in production management process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0032] A. The instantiation method of production tasks gradually adapting to capacity scheduling in the process of production management:

[0033] Before the production management system realizes the gradual production schedule described by the model, it is necessary to use the model to describe the production material requirements plan, manage the quantity and output date of material procurement, production, and outsourcing, and generate input for the production task. Model instantiation requires the following steps:

[0034] 1) According to the attached figure 1 The description data structure first establishes the definitions and associations of calendars, resources, and processes.

[0035] 2) According to the attached figure 2 The description data structure establishes the management of the production stage, so that the user can customize it, and the corresponding function number can be generated after the definition of each stage is completed.

[0036] 3) According to ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an implementation method for scheduling production task gradual adaptive capacity, which is used in production management software, particularly an implementation method for scheduling production task gradual adaptive capacity, which is used in a production management process and comprises the following steps: scheduling according to the providing capability of a production task adaptive resource; freely defining the stages of the scheduling while scheduling; and generally implementing the scheduling of the production task from coarse to fine. Therefore, the production time of the production task is enabled to be more accurate gradually; meanwhile, the capability of the resource is adjustable in the scheduling of the production task to enable the capability to be matched with the task, thereby, solving the problems that the production management software is difficult to be implemented; and the production management software is difficult to coincide with the requirement of user on-site management.

Description

technical field [0001] The patent of the present invention is a method for realizing the production task gradually adaptive capacity scheduling in the production management software, specifically, a realization method for the production task gradually adaptive capacity scheduling in the production management process. Background technique [0002] When the erp management software schedules production tasks according to capacity, it is generally divided into limited capacity scheduling and unlimited capacity scheduling. Whether it is limited capacity or unlimited capacity, it is required to schedule production tasks at one time according to the capacity provided by resources. , After production scheduling, the original occupied resources are often unbalanced in production capacity due to task changes and abnormal conditions on the workshop site, and resources cannot be changed in time or the impact on the delivery date and other tasks cannot be estimated after changing resource...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/00G06Q10/06
Inventor 陈明忠焦学瑞
Owner INSPUR COMMON SOFTWARE