Reinforcing method of roil soil kiln arch transplacement
A raw earth kiln dwelling and arch coupon technology, which is applied in building maintenance, construction, building construction, etc., can solve problems affecting the use and function of kiln chambers and cramped indoor space, so as to reduce damage and disturbance, improve safety and structural safety reliable effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Such as figure 1 , image 3 As shown, when the kiln wall above the kiln leg 1 and below the kiln ridge 2 of the raw earth kiln dwelling has cracks along the depth direction of the kiln dwelling, and when the arches are dislocated, the reinforcement process for the raw earth kiln dwelling is carried out. The specific process steps are as follows:
[0038] The first step, preparation before construction:
[0039] a. Check the cracks in the center of the raw earth kiln, judge its extension range, crack width and dislocation width, and analyze the range of soil that may cause collapse;
[0040] b. Use wooden pillars to support the soil that may collapse. The diameter of wooden pillars is 150mm, the interval between wooden pillars is 2m, and the number is 15;
[0041] c. Preparation of adobe 3: the adobe 3 is a wedge-shaped body with a length of 400 mm and a thickness of 60 mm. The width of the large end is 266 mm, and the width of the small end is 233 mm. Air-dry the adob...
Embodiment 2
[0054] Such as figure 2 , image 3 Shown, repeat embodiment one, have the following difference: in the second step, in the c step of rejecting cracked soil body, after stopping rejecting, measure the distance of stopping point apart from kiln ridge, at this moment, this distance is 700mm, then stop rejecting Soil mass, reinforced with partial arches.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 