Underground layered gas-liquid two phase fluid pressure and temperature-retaining sampling device
A sampling device and gas sampling technology, applied in the direction of wellbore/well components, earthwork drilling, etc., can solve problems such as unsatisfactory, unmaintainable sampling pressure and temperature, difficult control of sampling speed and sampling volume, etc., and achieve principle and Simple structure, increased fidelity, and high performance-price ratio
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2011-06-29
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to the field of fluid sampling in deep formations, and more particularly relates to a fidelity sampling device for stratified gas-liquid two-phase fluid in a well, which is suitable for fidelity sampling of underground fluids. Background technique
[0002] Subsurface fluids (including oil, oil and gas, groundwater, gas reservoirs, brine and other subsurface fluids) survey work includes understanding the characteristics and natural conditions of subsurface fluids, fluid components, concentrations, distribution ranges, and their transmission conditions and conditions in the underground environment. Change trends, as well as the potential hazards of fluids to people's health and living environment. Sampling technology occupies a very important position in the study of subsurface fluids (including petroleum, oil and gas, groundwater, gas reservoirs, brine and other subsurface fluids). Countries all over the world attach great importa...
Examples
Embodiment Construction
[0092] Below in conjunction with accompanying drawing and embodiment describe in detail:
[0093] A fidelity sampling device for layered gas-liquid two-phase fluid in a well, the sampling device consists of a packer system 10, a liquid sampling system 20, a gas sampling system 30, an automatic multi-way valve 40, a sampling system 50, and a temperature control system 60 , together with the external pressure / flow control part and external protection. A packer system 10 , a liquid sampling system 20 , a gas sampling system 30 , an automatic multi-way valve 40 , a sampling system 50 and a temperature control system 60 are installed on the inner wall 70 of the drilling or casing.
[0094] The packer system 10 includes a number of packers such as the first packer 11, the second packer 12, the third packer 13, and the fourth packer 14 (numbers are deduced by analogy, and the number of packers can be 4 -20 pieces) together; the first packer 11, the second packer 12, the third packer...