Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for retaining gob-side tunnel

A technology for retaining empty roadways and roadways, which is applied in the directions of earthwork drilling, shaft lining, tunnel lining, etc. It can solve the mutual interference between support and mining face operations, cannot meet the impact of two mining operations, and the effect of retaining roadways cannot be achieved. Anticipation and other problems, to achieve the effect of improving the support strength and support resistance of pier columns, reducing the cross-sectional area of ​​the roadway, and reducing the preparation time

Inactive Publication Date: 2013-12-18
贾民
View PDF10 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] In order to overcome the disadvantages of the existing technology that the tunneling before mining and the roadway retention after mining are independent of each other without overall consideration, the requirements of the influence of two mining operations cannot be met, and the effect of roadway retention cannot reach expectations, the present invention provides A gob-side retaining method, which makes an overall arrangement for the gob-side retaining of the mining face and the gob-side retaining after mining during the excavation stage of the mining face, and considers the roadway that needs to be retained at the beginning of excavation. It can greatly improve the strength and support resistance of the support body beside the gob-side entry retaining, and meet the requirements of the influence of two mining operations; and avoid the mutual interference between the support of the gob-side retaining entry and the operation of the mining face

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for retaining gob-side tunnel
  • Method for retaining gob-side tunnel
  • Method for retaining gob-side tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] The present invention will be further described below in conjunction with drawings and embodiments.

[0030] The surrounding rock of the gob-side retaining entry has gone through five stages: I excavation stage, II post-excavation stabilization stage, III first mining impact stage, IV mining impact post-stabilization stage, and V second mining impact stage. The largest amount of deformation is stage III, and the key area is behind the mining face. One side of the roadway is the coal side, and the other side is the falling gangue, which is similar to the section along the direction of the mining face. In the third stage of the gob-side entry retention, when the pressure from the old roof is strong and the settlement is severe, the mine pressure of the roadway is strong, and the deformation of the surrounding rock is large. Except for the period of violent movement of Laoding, the surrounding rock stress of gob-side entry retaining changes slowly.

[0031] The method of...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for retaining a gob-side tunnel, which overall arranges the retaining of the gob-side tunnel in a stope working face gateway tunneling period, and comprises the steps of: combining the stope working face gateway with the gob-side retained tunnel, namely the next section gateway, together to be served as one tunnel for tunneling; and constructing tunnel concrete pier columns between the stope working face gateway and the gob-side retained tunnel, wherein the tunnel concrete pier columns are served as support in the tunnel and also served as one part of the side support for the gob-side retained tunnel; namely comprising the steps of: widening the section of the tunnel by tunneling, reserving the tunnel section according to the shrinkage factor of the god-side retained tunnel suffering from two times of support pressure, and pouring the reinforcing steel bar concrete pier columns in middle of the transverse direction of the tunnel to match with a cable anchor for supporting. The tunnel concrete pier columns are arranged along the whole length of the tunnel at intervals, and used for dividing the tunnel into two parts. Insulating walls are constructed between two adjacent columns after the columns are constructed. When the stope is starting, the support is needed to be temporarily reinforced at two sides of the columns according to requirements along with the advancing of the stope working face. According to the method for retaining a gob-side tunnel, the retaining of the gob-side tunnel and the tunneling of the stope working face gateway are overall arranged, and the tunnel concrete pier column support is arranged; therefore, the side support intensity and support resistance of the retained tunnel are greatly enhanced, the influence of support pressure in two times of mining is effectively controlled. The method for retaining gob-side tunnel is particularly suitable for using in flexible mining faces of bottom plate and / or top plate.

Description

technical field [0001] The invention relates to a coal mine gob-side entry retention process, in particular to a gob-side entry retention method that arranges the mining face along the trough and the gob-side entry retention as a whole, and adopts concrete pouring support for the gob-side entry retention. Background technique [0002] In order to reduce the coal pillar loss between the coal mining section transportation and the track trough, no coal pillar mining is adopted, that is, the coal trough is reserved along the goaf to serve the mining face of the next section, which is called gob-side entry retention, also known abroad Reuse lanes. [0003] China's "Invention Patent Bulletin" discloses the invention application of the name: "Supporting method for retaining lanes along gob-side lanes", application number: 200710026096.9, publication number: CN 101117890A. Its purpose is to solve the support problem of gob-side entry retention; the measure is to install a filling f...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/08E21D21/00E21F17/103
Inventor 贾民
Owner 贾民
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products