Framework structure
A frame structure and rectangular frame technology, applied to elevated railways, elevated railway systems with suspended vehicles, roads, etc., can solve the problems of high cost, complex structure, long construction period, etc., achieve short construction period and improve work efficiency , The effect of fast construction progress
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2012-07-11
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to a frame structure, in particular to a frame structure that can be used for a rail transit system (hereinafter referred to as an empty rail system) for urban traffic arteries. Background technique
[0002] At present, urban rail transit systems mainly consist of subways and light rails, both of which have problems such as expensive construction costs, complex structures, and long construction periods. The cost per kilometer of the German H-Bahn skytrain has reached RMB 150 million. The diversification of urban transportation, rational use of urban effective space is a good way to enhance urban transportation capacity, and the development of ultra-light rail transit to the air is another development direction of urban rail transit. The ultra-light track has low load and distributed load, so it does not need to consume a lot of steel; single passenger and single ride can minimize energy consumption and achieve energy saving and en...
Examples
Embodiment Construction
[0023] figure 1 , figure 2 It is the front view and the left view of the frame structure, which is composed of arch support column 1, embedded parts 2, bearing beam 3, empty rail running corridor component 4, street lamp 5 and rail car 6.
[0024] In the green belts on both sides of the main traffic line, symmetrical piling or drilling d30cm deep 2.5m (deep through the frozen layer in the north) round holes, lower the reinforcement cage to pour concrete, set the embedded part 2, the embedded part 2 is 40x40x1cm iron plate (A3 ), and level it with a level. The length of the overall component 4 of the design empty rail running corridor is 30m, and the longitudinal spacing of symmetrical piling or drilling in the green belts on both sides of the road is 30m. The design width of the overall component component 4 of the empty rail running corridor is 6m, and there are 6 empty rail lines running. The arch support column 1 is made in the factory according to the design drawings, ...