Cross layer mapping management method of share risk link group
A technology for sharing risk links and management methods, applied in the field of cross-layer mapping management of shared risk link groups, can solve the problems of low accuracy, large workload, and improving the management complexity of shared risk link groups, etc. safety effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Such as figure 1 As shown, the shared risk link group cross-layer mapping management method described in this embodiment includes counting the number of underlying physical topology segments, counting the number of optical cable topology links, counting the number of WDM / OTN topology optical cable segments, and then entering the following steps:
[0031] Step 1: Analyze the underlying physical topology 1 ,Such as figure 2 As shown, there are 5 sections in the underlying physical topology section, and each section of the pipeline is named P in turn 1 ,P 2 ,P 3 …P 5 .
[0032] Step 2: If image 3 The fiber optic cable topology, the fiber optic cable has 4 paragraphs, which are F 1 , F 2 , F 3 , F 4 , and the bearer route of the optical cable is as follows Figure 6 shown.
[0033] Step 3: Set the variable i=1, where i represents the number of times to map the optical cable layer sharing risk link.
[0034] Step 4: i ≤ 5, pipe all through P i The cable sect...
Embodiment 2
[0043] Such as Figure 5 As shown, in the shared risk link group cross-layer mapping management method described in this embodiment, on the basis of Embodiment 1, the C-E node adds a route P 6 , the underlying physical topology changes to Figure 5 , the bearer route of the optical cable network is changed to Figure 10 . According to the prompting of the inventive method again, repeat the operation of step 1 to step 7, obtain the new shared risk link form of optical cable network and WDM / OTN network, as Figure 11 and Figure 12shown. Re-arrange routes for service A-C. On the premise of sufficient channel resources, the main route of A-C is W1, and the backup route is W2-W3. The service security level has been effectively improved.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com