Highway, hectometer stake and construction methods for hectometer stake
A construction method and 100-meter technology, applied in the construction of 100-meter piles, can solve the problems of difficult maintenance, high cost, mud pollution, etc., and achieve the goal of eliminating roadside obstacles, not easy to damage, and high safety Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0048] The first object of the present invention is to provide a 100-meter pile with high safety, convenient construction, low cost, less damage and easy maintenance and repair. The second object of the present invention is to provide a road with the above-mentioned 100-meter pile. The third object of the present invention is to provide two kinds of construction methods of 100-meter piles.
[0049] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0050] The 100-meter pile provided by the embodiment of the present ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com