River and sea bottom steel jacking pipe butt joint construction method

A construction method, steel pipe jacking technology, applied in the direction of pipes/pipe joints/fittings, pipe laying and maintenance, mechanical equipment, etc., can solve the problems of quicksand and water leakage, shorten the construction period, broad market prospects, meet The effect of the construction period

Active Publication Date: 2014-02-26
XIAMEN WATER GRP
View PDF6 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] What the present invention aims to solve is that in the construction of steel pipe jacking projects under the seabed environment, the butt joint positions of pipe jacking are all in the extremely soft sandy soil layer in seawater, and th

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • River and sea bottom steel jacking pipe butt joint construction method
  • River and sea bottom steel jacking pipe butt joint construction method
  • River and sea bottom steel jacking pipe butt joint construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. However, this invention may be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art. In these drawings, the size and relative sizes of layers and regions may be exaggerated for clarity.

[0027] What the present invention discloses is a butt joint construction method of steel pipe jacking on the sea bottom of the river, such as figure 1 Shown is a flow chart of the present invention, and described construction method comprises the steps:

[0028] Step S101, taking soil reinforcement measures for the purpose of water stop in the seabed docking area.

[0029] Such as figure 2 As shown, in this embodiment, the r...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a river and sea bottom steel jacking pipe butt joint construction method. The method includes: for soil in a butt joint region, on the basis of taking a simple reinforcement measure of high-pressure spiral jet grouting used in land and underground jacking pipe butt joint, assisting with double-liquid grouting water stoppage and leaking stoppage measures so as to realize soil reinforcement with the main purpose of water stoppage; arranging a first temporary steel-structure external formwork support water stopping ring; transporting a reelpipe to the butt joint region in a divisional manner prior to assembling and welding, and finally finishing large-diameter steel jacking pipe butt joint in the sea bottom environment. By the method, not only can the requirements on tool pipe butt joint under complicated and restricted conditions that steel jacking pipe butt joint positions are all located in extremely-soft sandy soil layers of the sea bottom and drift sand and water leakage are easily caused under the impact of tides be met, but also the requirement for shortening long-distance jacking pipe construction period can be met. The key water stoppage problem which needs to be solved in jacking pipe butt joint construction in the soft sandy soil layers of the sea bottom is solved, engineering cost and risk are low, and the method has broad market prospect.

Description

technical field [0001] The invention relates to a construction method for steel pipe jacking, in particular to a construction method used in underwater pipe jacking projects such as rivers, lakes, seas, etc., which can solve extremely soft sandy soil layers at the bottom of the water, or be affected by tides at the butt joint position of pipe jacking. It is very easy to produce quicksand and water leakage and other complex or restricted steel pipe jacking construction methods. Background technique [0002] As a non-excavation tunnel construction technology, pipe jacking technology can cross roads, rivers or ground buildings. With the rapid development of urban construction, pipe jacking technology has been widely used in transportation, energy, electricity, drainage and other fields due to its advantages such as wide application range of soil layers, little disturbance to soil, and no impact on ground transportation. Compared with concrete pipe jacking, steel pipe jacking h...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): F16L1/26F16L1/16
CPCF16L1/161F16L1/26
Inventor 李清华成果刘翔
Owner XIAMEN WATER GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products