A method for supporting bearer establishment, a base station and a mobility management entity
A technology for managing entities and bearer establishment. It is used in connection management, broadcast service distribution, electrical components, etc., and can solve the problem that the core network cannot support CSG charging.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0111] The schematic diagram of Embodiment 1 of the method for supporting bearer establishment in the present invention is as follows Figure 4 shown. This embodiment is applicable to the scenario where the SeNB has a direct interface with the MeNB, and the MeNB establishes the bearer to the SeNB cell supporting CSG when the bearer is established during the UE attach or location update process, where SeNB1 and SeNB2 are two SeNBs under the MeNB. Figure 4 The shown method includes the following steps:
[0112] Step 401: The MeNB obtains the CSG ID and / or cell access mode supported by the SeNB cell through OAM, or during the establishment of the interface between the MeNB and the SeNB, or during the eNB configuration update process. During UE attach or location update process, MeNB can report the CSG identity supported by the SeNB cell covered by MeNB to MME in two ways, which are step 403 and step 406 respectively.
[0113] Step 402: UE initiates an attach request or a locat...
Embodiment 2
[0140] The schematic diagram of Embodiment 2 of the method for supporting bearer establishment in the present invention is as follows Figure 5 shown. This embodiment is applicable to the scenario where the SeNB has a direct interface with the MeNB, and when the UE switches to the MeNB through S1 handover, the MeNB establishes a bearer to the SeNB cell supporting CSG. Figure 5 The shown method includes the following steps:
[0141] Step 501: The MeNB obtains the CSG identity and / or cell access mode supported by the SeNB cell through OAM, or during the establishment of the interface between the MeNB and the SeNB, or during the eNB configuration update process. During the S1 handover process, the CSG identity supported by the SeNB cell covered by the MeNB can be reported to the MME in two ways, which are step 502 and step 505 respectively.
[0142] Step 502: During the establishment of the X2 interface between the source eNB and the target MeNB or during the eNB configuration...
Embodiment 3
[0156] The schematic diagram of Embodiment 3 of the method for supporting bearer establishment in the present invention is as follows Image 6 shown. This embodiment is applicable to a scenario where the SeNB has a direct interface with the MeNB, and when the UE switches to the MeNB through X2 handover, the MeNB establishes a bearer to the SeNB cell supporting CSG. Image 6 The shown method includes the following steps:
[0157] Step 601: The MeNB obtains the CSG identity and / or cell access mode supported by the SeNB cell through OAM, or during the establishment of the interface between the MeNB and the SeNB, or during the eNB configuration update process.
[0158] Step 602: the source eNB sends a handover request to the target MeNB.
[0159] Step 603: The target MeNB establishes the UE bearer under the MeNB cell, and sends a handover request confirmation to the source eNB.
[0160] Step 604: The source eNB sends RRC reconfiguration to the UE.
[0161] Step 605: The target...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com