Construction method for transfer between existing subway station and newly built subway station platform

A technology for existing subways and subway stations, applied in excavation, construction, artificial islands, etc., can solve problems such as changing the stress mode of existing station structures, endangering the safe operation of subways, shortening transfer distances, etc., and achieves simple and easy construction methods travel, structural safety, and less transfer time

Active Publication Date: 2016-09-28
CHINA MAJOR BRIDGE ENERGINEERING
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The construction of the transfer method at the station hall level is simple and has little impact on the safety of subway operation, but the transfer distance is long, the transfer time is long, and the service level is low; while the platform transfer can effectively shorten the transfer distance, reduce the transfer time, and improve Service level, but because the existing stations have been built for a long time, usually no transfer conditions are reserved
There are the following risks in the use of platform transfers: (1) breaking the structural floor of the existing station will have a great impact on the operation of the subway, (2) it may change the stress mode of the existing station structure, (3) excavating a new station under the floor of the existing station space could jeopardize subway safety operations

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for transfer between existing subway station and newly built subway station platform
  • Construction method for transfer between existing subway station and newly built subway station platform
  • Construction method for transfer between existing subway station and newly built subway station platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0023] According to the invention, the connection structure is dug underground from the platform layer of the newly built station to reach the designated position of the opening of the bottom plate of the station of the existing line. Adopt a reasonable reinforcement plan to reinforce the soil layer, and excavate the caverns on the horizontal excavation structure of the existing line in two steps. After the cavern structures on both sides reach a certain strength, the existing station floor will be removed. Pass through the platform transfer channel.

[0024] Concrete construction steps of the present invention are as follows:

[0025] (1) Refer to Figure 4 , Figure 11 , from the platform layer of the new station 2 to the pedestrian passage 6 under the structural floor 3 of the existing station, and the pedestrian passage 6 is excavated to reach the desi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method for implementing transfer between a platform floor of the existing subway station and a platform floor of a new subway station. The construction method comprises the following steps of constructing the platform floor of the new subway station to a pedestrian path below a structural bottom plate of the existing subway station; reinforcing strata surrounding the pedestrian path; dividing a structural bottom plate longitudinal beam of a passageway which is arranged at a position of a table board of the existing subway station and is connected to the pedestrian path into a left portion and a right portion; respectively constructing the left portion and the right portion; correspondingly constructing surrounding rock of an excavation structure at a position of a structural bottom plate longitudinal beam on a side wall of a constructed pedestrian passage structure; breaking down a waterproof layer, a reinforcement cover, construction preliminary bracings and cross braces, a construction waterproof layer and assembling reinforcements on a structural bottom plate portion of a platform of the existing subway station; connecting a new structure and the existing structure by using embedded steel bars; pouring side walls and middle walls; constructing another structural bottom plate longitudinal beam to obtain a complete passageway structure; finishing construction of the passageway of the pedestrian path; and connecting the platform floor of the existing subway station to the platform floor of the new subway station. A construction process is safe, the practicability is high, and normal operation of the existing subway lines is not affected.

Description

technical field [0001] The invention belongs to the technical field of subway station design and construction, and in particular relates to a construction method for transferring between an existing subway station and a newly built subway station platform. Background technique [0002] The purpose of building a rail transit network is to ensure the smooth and fast travel of citizens, and to provide passengers with a safe, convenient and comfortable environment. With the continuous expansion of the urban rail transit network, the status of the transfer station is becoming more and more prominent, becoming the main factor affecting the efficiency and service level of rail transit. [0003] When a new station needs to transfer to an existing station, there are usually two transfer conditions, that is, platform transfer and station hall transfer. The construction of the transfer method at the station hall level is simple and has little impact on the safety of subway operation, ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D29/045E02D17/04
CPCE02D17/04E02D29/045
Inventor 王腾飞周小涵雷文革胡骏
Owner CHINA MAJOR BRIDGE ENERGINEERING
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products