A technology for reinforced concrete beams and blastholes, which is applied in blasting, building maintenance, construction, etc., can solve the problems of blasting blockage and blasting network connection operation workload, multiple detonators and blocking materials, prone to misoperation, etc., and achieves improvement. Blasting blasting effect, reducing the consumption of explosives and detonators, reducing the effect of workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] The width×height×length of the reinforced concrete beam is 0.4m×0.6m×4m, and the pre-embedded PVC pipe with a diameter of 30 mm is used as the pre-embedded blasthole, which is arranged on the longitudinal axis of the beam with a length of 4 m, and the openings at both ends are in the beam end cross section. Emulsion explosive rolls have a diameter of 25 mm and a length of 0.2 m, adopting a discontinuous charge structure with a spacing of 0.2 m.
[0039] According to the above-mentioned axial pre-buried blast hole and blast hole charge structure, the construction process of the present invention is:
[0040] 1) Destroy the concrete protective layer, find the PVC embedded pipe, and clean the pipe with compressed air;
[0041] 2) Discontinuously bind the charges on the detonating cord at 0.2m intervals, and then send them into the pre-embedded pipe;
[0042] 3) Detonate the detonating cord.
Embodiment 2
[0044] The width × height × length of the reinforced concrete beam is 0.6 m × 0.9 m × 6.5 m, and the ends of the beam are not visible. Two PVC pipes with a diameter of 30mm are pre-embedded and arranged in the longitudinal direction of the beam as the pre-embedded blast holes. The middle section is parallel to the longitudinal axis of the beam, and the ends are bent upwards, opening on the upper surface near the end of the beam. The distance between the two blastholes is 0.3m, and the distance between the left and right sides of the beam is 0.3m; the distance between the upper blasthole and the upper surface of the beam is 0.3m, and the distance between the lower blasthole and the lower surface of the beam is 0.3m. Discontinuous charge is adopted, the diameter of the emulsified medicine roll is 25mm, the length of the medicine roll is 0.2m, and the distance between the medicine rolls is 0.2m.
[0045] According to the above-mentioned axial pre-buried blast hole and blast hole ...
Embodiment 3
[0050] The width × height × length of the reinforced concrete beam is 1.4m × 2.1m × 6m. Two PVC pipes with a diameter of 32mm are pre-embedded and arranged in the longitudinal direction of the beam as pre-embedded blastholes, parallel to the axis of the beam, and opened on the cross-section of the end of the beam. The distance between the two blastholes is 0.7m, and the distance between the left and right sides of the beam is 0.7m m; the upper blasthole is 0.7m from the upper surface of the beam, and the lower blasthole is 0.7m from the lower surface of the beam. The continuous charge structure is adopted, and the holes are blocked with gun mud. A water gel explosive charge tube with a diameter of 28mm and a length of 0.2m is used.
[0051] According to the above-mentioned axial pre-buried blast hole and blast hole charge structure, the construction process of the present invention is:
[0052] 1) Destroy the concrete protective layer, find the PVC embedded pipe, and clean t...