A double-row pile supporting structure capable of making full use of basement space and its construction method
A technology of support structure and construction method, which is applied in the direction of foundation structure engineering, excavation, construction, etc., can solve the problems of high rigidity of the cantilever double-row pile support structure, insufficient utilization of basement space, and inability to meet the deformation of the foundation pit, etc. To achieve the effect of increasing the available space, increasing the use, and controlling the displacement of the pile body
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Embodiment 1: as figure 1 As shown, a double-row pile support structure that can make full use of the basement space consists of a front row of piles 1, a rear row of piles 2, crown beams I3, crown beams II4, connecting beams I5, water-stop curtain piles 6, basement 7, Engineering pile 8, plain concrete 9, layered tamped filling 10, basement floor 12, basement floor 13, connecting beam Ⅱ 14; among them, the top of pile 1 in the front row is equipped with crown beam Ⅰ 3, and the pile in the back row The top of pile 2 is provided with crown beam II4, the pile tops of front row pile 1 and rear row pile 2 are connected by coupling beam I5, and water-stop curtain pile 6 is installed in the soil behind the back row pile 2 piles. Construct all engineering piles 8, and pour a connecting beam II14 on top of pile 1 in the front row after removal. Layer tamped fill soil 10, fill plain concrete 9 between the front row of piles 1 and the basement floor 13 of the negative second flo...
Embodiment 2
[0042] Embodiment 2: as figure 1 Shown, basically the same as embodiment 1, its difference:
[0043] A construction method for a double-row pile support structure capable of making full use of basement space, wherein the length of the front row of piles 1 can be designed to be greater than the length of the rear row of piles 2 .
Embodiment 3
[0044] Embodiment 3: as figure 1 Shown, basically the same as embodiment 1, its difference:
[0045] A double-row pile support structure that can make full use of the basement space, the pile bodies of the front row of piles 1 and the rear row of piles 2 are arranged in a "T"-shaped array and arranged at intervals.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com