Construction method for quickly pouring anti-slide pile protection wall concrete

A construction method and concrete technology, applied in excavation, foundation structure engineering, construction, etc., can solve problems affecting the progress of excavation of anti-slide piles, quality and safety hazards of retaining walls, and gaps in concrete quality, so as to eliminate hidden dangers in the quality of retaining walls , Good wall quality control and short construction period

Active Publication Date: 2016-05-04
CHINA RAILWAY 18TH BUREAU GRP CO LTD +1
View PDF7 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Usually, for the convenience of pouring the retaining wall concrete, a space of 15 to 20 cm is reserved between the upper part of the formwork and the previous retaining wall as the concrete feed port, so that a gap of about 20 cm will be left between the two pouring retaining walls. This gap is usually filled with mortar after the concrete pouring of the retaining wall is completed, and the gap of the feed inlet

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for quickly pouring anti-slide pile protection wall concrete
  • Construction method for quickly pouring anti-slide pile protection wall concrete
  • Construction method for quickly pouring anti-slide pile protection wall concrete

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] Such as Figure 1-3 As shown, the anti-slide pile retaining formwork support and concrete pouring structure, the structure includes sand cushion bottom mold 1, supporting steel pipe 2, adjusting screw 3, retaining formwork 4, chute 5, concrete bucket 6, anti-slide pile Retaining wall 7, lifting hoist 8; both ends of the supporting steel pipe 2 are respectively connected with the adjusting screw 3, the adjusting screw 3 is fixed on the retaining wall template 4, and the retaining wall template 4 is installed on the bottom mold 1 of the sand cushion layer; the anti-sliding pile retaining wall 7 is set On the retaining formwork 4, a chute 5 is installed on the inner wall of the anti-slide pile retaining wall 7, the chute 5 corresponds to the position of the concrete bucket 6, and the concrete to be poured is placed in the concrete bucket 6; the concrete bucket 6 Link to each other with lifting winch 8.

[0023] The supporting steel pipes 2 are sequentially connected to fo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a construction method for quickly pouring anti-slide pile protection wall concrete. After a previous section of poured protection wall concrete has a certain strength, a sand cushion layer is cleared, all sand cushions are collected together for standby application, and anti-slide pile excavation is continued; after the pouring height of one section of a protection wall is reached, protection wall steel bars are welded and bound under the poured protection wall; a sand bottom moldboard is laid to the position 3 centimeters above the bottom of a protection wall side moldboard, and the width of the sand bottom moldboard is 30 centimeters or above larger than that of the protection wall side moldboard; the optimized and improved protection wall side moldboard in which concrete feeding holes are pre-formed is erected, after the side moldboard is erected, the bottom of the side moldboard is embedded deep into 3 centimeters in a sand layer to prevent grout runout, the portion 5 centimeters above the top of the side moldboard is closely attached to the face of the previous section of the protection wall, and the protection wall moldboard is reinforced through steel pipes and adjustable lead screws. A concrete lifting bucket is lifted through a small lifting winch, the concrete can be directly poured into the moldboards through a simple movable concrete sliding groove, the concrete pouring speed is high, and the labor intensity of workers is reduced. Through the steps, quick construction of the anti-slide pile sand bottom moldboards is achieved.

Description

technical field [0001] The invention relates to the technical field of rapid construction of anti-sliding piles in loose and weak deep covering layers such as rock piles, in particular to a construction method for rapid pouring of anti-sliding pile wall protection concrete in loose rock piles in deep covering layers. Background technique [0002] In view of the large depth of the anti-slide pile covering layer, due to the influence of unfavorable geological conditions such as rock piles and water seepage during excavation, it is easy to cause collapse, causing safety accidents, and is also extremely unfavorable to the progress of the project. After research, the rapid construction of retaining walls, Ensuring the quality of retaining walls can solve such problems, and the construction speed and quality of retaining walls depend on the speed and quality of reinforcement, formwork installation and concrete pouring of retaining walls, as well as the scientific construction techn...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D17/08
CPCE02D17/08
Inventor 宋宏坤
Owner CHINA RAILWAY 18TH BUREAU GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products