Pile foundation hole forming construction process under large-particle-size cobble sandy soil and severe water seepage geological condition

A technology based on geological conditions and construction technology, applied in infrastructure engineering, sheet pile walls, buildings, etc., can solve problems such as increasing the hidden danger of quality and safety in the drilling process, affecting the drilling progress, and large wear of the drill bit, so as to improve the construction efficiency, The effect of improving the quality of pile foundation and prolonging the service life

Inactive Publication Date: 2016-09-28
STEEL STRUCTURE CONSTR CO LTD OF CHINA TIESUU CIVIL ENG GRP
View PDF2 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, under the geological conditions of sandy soil with large particle size pebbles and severe water seepage, the large particle size pebbles will wear the drill bit greatly, which will affect the drilling progress; under the influence of severe penetration of water flow, the mud will not be able to play the role of protecting the wall, which will lead to collapse. holes, increasing the quality and safety hazards in the hole making process

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] A construction technique for forming holes in pile foundations under the geological conditions of large-size pebble sand and severe water seepage, using rotary drilling rig drilling and casing follow-up technology to form holes, and the specific construction steps are as follows:

[0030] (1) Site leveling; including construction access roads and site leveling within the construction area;

[0031] (2) Pile position setting out; according to the technical disclosure information, use the total station to measure and set out the line, determine the specific position of the pile, and mark the center position of the pile in the form of painting short steel bars;

[0032] (3) Insert and drill the outer steel casing; use the crawler crane and the hydraulic vibrating hammer to insert and drill the outer steel casing to 4~6m below the riverbed ground, the wall thickness of the outer steel casing is not less than 10mm, and its diameter is larger than the actual bored pile diamete...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a pile foundation hole forming construction process under the large-particle-size cobble sandy soil and severe water seepage geological condition. Holes are formed through a follow-up process that rotary drilling rig drilling is matched with a steel casing. The pile foundation hole forming construction process comprises the specific construction steps that 1, site formation is conducted, specifically, site formation of a pioneer road and site formation within a construction area range are conducted; 2, pile position lofting is conducted, specifically, on the basis of technical disclosure data, surveying and setting out are conducted through a total station, the specific position of a pile is determined, and a marker is made in the center of the pile in the mode of coating a short steel bar with paint; and 3, outer-side steel casing inserting and beating are conducted, specifically, an outer-side steel casing is inserted and beat to the position 4-6 m under the river bed ground with a crawler crane being matched with a hydraulic vibration hammer, the wall thickness of the outer-side steel casing is not less than 10 mm, and the diameter of the outer-side steel casing is 40 cm larger than that of the actual drilled pile. According to the pile foundation hole forming construction process under the large-particle-size cobble sandy soil and severe water seepage geological condition, the problem that drilling is difficult due to the fact that a rotary drilling rig encounters large-particle-size cobbles during construction is solved, the amount of drill slag after the holes are formed is decreased, the problem that the holes are not cleaned thoroughly is solved, accordingly, the drilling time is shortened, and the formed hole quality is improved.

Description

technical field [0001] The invention relates to a construction technique for pile foundation hole forming under the geological conditions of large particle size pebble sand and serious water seepage, mainly used in the hole forming construction of pile foundation rotary drilling rig, and overcomes the problem of large particle size in the construction of rotary drilling rig. Difficult drilling of diameter pebbles, avoiding the problem of hole collapse during the drilling process under the condition of severe water seepage and difficult mud protection, reducing the amount of drilling slag after hole formation, avoiding the problem of incomplete hole cleaning, thereby reducing drilling time and improving hole quality . Background technique [0002] Drilling a hole with a rotary drilling rig is a common hole-forming process for pile foundations, and is widely used in the construction of pile foundations for railways, highways, bridges and large buildings. [0003] In the hole-...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/38
CPCE02D5/385
Inventor 张庆发张建金聂宗泉李荣浩邢文彬刘欢齐斌
Owner STEEL STRUCTURE CONSTR CO LTD OF CHINA TIESUU CIVIL ENG GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products