Construction process for superlarge-section and large-dip-angle tunnel type pile foundation

A technology with super large cross-section and construction technology, applied in infrastructure engineering, construction, etc., can solve the problems such as the inability to use rail transportation for slag or ballast, the inability to monitor the changes of surrounding rock in real time, and the large construction safety risk, etc. The effect of mechanized construction level, improving excavation stability and high construction efficiency

Active Publication Date: 2016-09-28
CHINA RAILWAY FIRST GRP CO LTD +2
View PDF7 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the above-mentioned excavation method has the following defects and deficiencies in the following three aspects: ① When excavating sections and steps, the safety of excavation is improved by reducing the construction space and increasing the support in the body, but the space is so small that it is impossible to use machinery. Coordination and low degree of mechanization have greatly reduced the construction progress and brought difficulties to the construction; ②The support process is complicated, and the use of manual installation of the support structure greatly reduces the construction efficiency, and it is impossible to monitor the changes of surrounding rocks in real time, and the construction safety risk is great ;③ Due to the large inclination angle of the foundation, large-scale machinery cannot enter and exit the foundation by itself, and the muck or ballast cannot be removed by rail transportation, and the construction efficiency is extremely low

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction process for superlarge-section and large-dip-angle tunnel type pile foundation
  • Construction process for superlarge-section and large-dip-angle tunnel type pile foundation
  • Construction process for superlarge-section and large-dip-angle tunnel type pile foundation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0082] like figure 1 Shown is a super-large cross-section and high-inclination tunnel pile foundation construction process, the pile foundation constructed is a reinforced concrete pile, and the pile hole of the reinforced concrete pile is a super-large-section and high-inclination tunnel hole 1, and the super-large-section and high-inclination angle tunnel hole 1 The cross-sectional area is greater than 100m 2 And its inclination angle is greater than 45°; when constructing the pile foundation, the following steps are included:

[0083] Step 1, pile hole construction, the process is as follows:

[0084] Step 101, pipe shed advance support construction: carry out pipe shed advance support construction on the top of the pile hole, and obtain the constructed pipe shed advance support structure, see figure 2 ;

[0085] Step 102, opening protection: constructing an opening support structure at the opening of the pile hole;

[0086] Step 103, pile hole excavation construction:...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction process for a supperlarge-section and large-dip-angle tunnel type pile foundation. The pile foundation to be constructed is a reinforced concrete pile. A pile hole of the reinforced concrete pile is a superlarge-section large-dip-angle tunnel hole. In construction of the pile foundation to be constructed, the process comprises the steps of firstly, pile hole construction, i.e., 101, advanced pipe shed support construction is conducted at the top of the pile hole, 102, hole mouth protection is conducted and a hole mouth support structure is constructed at a hole mouth of the pile hole, and 103, pile hole excavation construction is conducted, a full section excavation method is adopted for the pile hole excavation with a plurality of construction segments arranged from top to bottom, and a full section support structure is adopted for supporting; and secondly, pile body construction, i.e., the pile body of the reinforced concrete pile is constructed, and the construction process comprises the two steps of reinforcing cage binding and concrete spouting. The construction process for the supperlarge-section and large-dip-angle tunnel type pile foundation is simple in step, reasonable in design, low in investment cost, simple and easy to construct, good in use effect and capable of easily and fast completing the construction process of the tunnel type pile foundation, and the construction process is easy to control.

Description

technical field [0001] The invention belongs to the technical field of pile foundation construction, and in particular relates to a super-large-section and large-inclination-angle tunnel-type pile foundation construction technology. Background technique [0002] At present, during the construction of bridge pile foundations, the excavated cross-sectional area is greater than 100m 2 And when the pile foundation with an inclination angle (that is, the angle with the horizontal plane) greater than 45° is constructed, there is no set of mature construction methods to follow. Since the pile hole of the above-mentioned pile foundation is similar to the tunnel hole of a super-large-section and high-inclination tunnel, the pile foundation is called a super-large-section and high-inclination tunnel pile foundation, or tunnel pile foundation for short. Nowadays, the excavation cross-sectional area is greater than 100m 2 And when the super-large cross-section and high-inclination tun...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D27/12
CPCE02D27/12
Inventor 王高平余海董晓光静国锋胡文俊李昌宁徐永祥景兆德程小刚李小龙袁玉雷田建伟刘涛冯四超赵建民毕张龙
Owner CHINA RAILWAY FIRST GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products