Power transmission and transformation construction cost basic data collection and analysis system

A basic data and engineering cost technology, applied in data processing applications, instruments, calculations, etc., can solve problems such as low work efficiency, inaccurate cost analysis results, affecting the accuracy of cost analysis data, etc., to reduce workload and improve accuracy. The effect of accurate and accurate sample data

CN105989546AInactive Publication Date: 2016-10-05国网吉林省电力有限公司经济技术研究院
3 Cites 13 Cited by

Patent Information

Authority / Receiving Office
CN · China
Current Assignee / Owner
Publication Date
2016-10-05
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a power transmission and transformation construction cost basic data collection and analysis system comprising a construction cost analysis data collection module, a data verification module, a decision support module, a result output module, an allocation management module, a system management module and a database. The main advantages of the power transmission and transformation construction cost basic data collection and analysis system are that a provincial company construction cost analysis basic database can be established by the system so that the basic data can be provided for later construction cost analysis, and performing of later construction cost analysis work of the state grid, the energy bureau, the provincial company and the research institute is facilitated for an electric power company; and construction cost analysis indicator collection work is allocated to daily work by information means so that the workload of construction cost indicator collection can be reduced for all power supply companies and relevant organizations, the accuracy of indicator data collection can be enhanced by automatic verification and indicator data verification and thus the real, effective and accurate sample data can be provided for the construction cost analysis work.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to a system for collecting and analyzing cost basic data of power transmission and transformation projects, which is mainly used for electric power companies to analyze the cost of power transmission and transformation projects, and belongs to the field of cost analysis of power transmission and transformation projects. Background technique

[0002] In recent years, with the continuous deepening of power system reform and the sustained and rapid growth of the national economy, China's power grid construction and transformation have made brilliant achievements, but with the increase in investment scale, the impact of project cost levels on power grid development has become more and more significant Therefore, the cost of power grid projects has attracted much attention. During the "Thirteenth Five-Year Plan" period, various power grid enterprises will continue to increase investment in power grid construction, and business operatio...

Examples

Embodiment Construction

[0037] The present invention will be further described below in conjunction with specific embodiments, and the advantages and characteristics of the present invention will become clearer along with the description. However, it should be understood that the described embodiments are only exemplary and do not constitute any limitation to the scope of the present invention. Those skilled in the art should understand that the details and forms of the technical solution of the present invention can be modified or replaced without departing from the spirit and scope of the present invention, but these modifications or replacements all fall within the protection scope of the present invention.

[0038] see Figure 1 to Figure 7 According to the invention, a basic data collection system for power transmission and transformation project cost analysis includes a cost analysis data collection module 1, a data verification module 2, a decision support module 3, an achievement output modul...