Electroplating comprehensive wastewater intelligent treatment device and its control method
A technology of electroplating synthesis and treatment equipment, which is applied in the direction of water treatment parameter control, metallurgical wastewater treatment, multi-stage water treatment, etc., can solve the problems of easy fouling and clogging of membranes, complex components of comprehensive wastewater, and difficulty in popularization, etc., and achieve shortening of influent the effect of time
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2019-02-01
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to an intelligent wastewater treatment device and a control method thereof, in particular to a batch-sequential treatment device for electroplating wastewater and a control method thereof. Background technique
[0002] Electroplating comprehensive wastewater is the terminal wastewater collected after various treatments of electroplating wastewater, so it must be strictly treated before it can be discharged. According to the requirements of the clean production law, while achieving the standard treatment of electroplating wastewater, it is necessary to effectively recover the heavy metals and recycle the wastewater. Therefore, various enterprises have begun to use resource-based treatment methods such as water separation and treatment, water recovery, and heavy metal recovery to treat wastewater, but no matter what the method is, comprehensive wastewater will be generated, because even for enterprises that carry out strict water se...
Examples
Embodiment 1
[0045] This example provides a treatment method for generating 150 cubic meters of comprehensive electroplating wastewater every day. 1. The composition of wastewater is as follows:
[0046] Table 1
[0047]
[0048] Note*: Cr is total chromium--Cr 6+ with Cr 3+ Sum.
[0049] 2. Flow / velocity
[0050] Peak flow Q P =15m 3 / h time T P = 4h
[0051] Average flow Q 0 =7.5m 3 / h time T 0 =20h
[0052] 3. Discharge standard after wastewater treatment:
[0053] Table 2
[0054]
[0055] Note*: Cr is total chromium--Cr 6+ with Cr 3+ Sum.
[0056] The system equipment is composed as follows: figure 1 shown
[0057] 1. Waste water collection system: composed of 8.01 tank, ultrasonic level gauge C01, PP centrifugal pump 6.01, electromagnetic flowmeter LM1 and UPVC pipe valve.
[0058] Q P =10m 3 / h T p =4h batch processing time=4h batch processing volume=15×2m 3 (2 reactors, each effective volume = 15m 3 ) = 30m 3 Q t =30÷4=7.5m 3 / h
[0059] Effective...
Embodiment 2
[0094] The comprehensive electroplating wastewater treatment method that produces 300 cubic meters of electroplating every day provided by this embodiment.
[0095] 1. The composition of wastewater is as follows:
[0096] Table 1
[0097]
[0098] Note*: Cr is total chromium--Cr 6+ with Cr 3+ Sum.
[0099] 2. Flow / velocity
[0100] Peak flow Q P =25m 3 / h time T P =6h
[0101] Average flow Q 0 =15m 3 / h time T 0 =20h
[0102] 3. Discharge standard after wastewater treatment:
[0103] Table 2
[0104]
[0105] Note*: Cr is total chromium--Cr 6+ with Cr 3+ Sum.
[0106] The system equipment is composed as follows:
[0107] 1. Waste water collection system: composed of 8.01 tank, ultrasonic level gauge C01, PP centrifugal pump 6.01, electromagnetic flowmeter LM1 and UPVC pipe valve.
[0108] Q P =25m 3 / h T p =6h Reaction tank batch processing time=4h Batch processing capacity=30×2m 3 (2 reactors, each effective volume = 30m 3 ) = 60m 3 Q t =60÷4=1...