BIM-technology-based construction manpower management system and construction manpower management method
A management system and management method technology, applied in the field of construction labor management system and construction labor management, can solve the legal risks of engineering projects, calculate labor planning input, construction cost waste, etc., to maintain safe production order, improve assessment and The effect of rewards and punishments and the consolidation of labor discipline
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] A construction labor management system based on BIM technology, such as figure 1 As shown: the construction labor management system includes a labor management system 2, and the labor information of the labor management system 2 is associated with the building information model 1 established with BIM technology to form a construction labor management system based on BIM technology. Turn the existing static workforce management system into a dynamic workforce management system.
[0044] The labor force management system 2 includes a labor force plan management module 21, a labor contract management module 22, an education and training management module 23, an access control system management module 24, an on-site dynamic management module 25 and a labor wage management module 26;
[0045] The labor plan management module 21 is used to obtain a labor plan; the labor plan management module 21 correlates with construction cost and progress information, compiles a labor plan...
Embodiment 2
[0053] A construction labor management method based on BIM technology, which utilizes the construction labor management system based on BIM technology described in Embodiment 1 to realize the construction labor management method, and its steps include:
[0054] A: Preparatory work for creating a construction labor management system based on BIM technology:
[0055] A1: According to the construction organization design documents, construction special plan, enterprise quota and BIM-based construction detailed design model, the labor force plan is drawn up, and the proposed labor plan is generated. The construction detailed design model refers to the construction design model that is re-made on the basis of the design drawings after the design drawings are obtained and combined with the actual situation.
[0056] A2: Based on similar project experience, enterprise construction quotas, and construction schedule plans, balance and optimize the labor plan; combine the area of cons...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com