Works progress data inputting and recording method of constructional engineering management system
A technology of construction engineering and management system, which is applied in the field of project progress data entry in the construction engineering management system, and can solve problems such as waste of human resources and cumbersome work discipline inspection committees
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0064] A construction project management system project progress data entry method, comprising the following steps:
[0065] Step 1: The builder uploads unconstructed photos and renderings of the building;
[0066] Step 2: The builder takes photos of the current building according to the progress and uploads them to the construction project management system, and the construction project management system saves the photos as the current progress;
[0067] Step 3: The user continues to take photos of the current concealed project according to the progress of the construction project and then uploads the photos to the construction project management system. The construction project management system adjusts the current photo and compares it with the current progress to select the difference in the construction project. Then save the current photo as the current progress;
[0068] Step 4: If the current difference part is a concealed project, then execute step 5, otherwise, the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com