A river health evaluation method and evaluation device
An evaluation method and river technology, which can be used in measuring devices, open-air water source surveys, instruments, etc., can solve problems such as inapplicability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0097] Embodiment 1 of the present application proposes a kind of evaluation method of river health, such as figure 1 Shown is a flow chart of the method, and the specific steps are as follows:
[0098] S100. Collect hydrological parameters of the river to be evaluated in a set time period, the hydrological parameters include static flow, static water temperature, precipitation and air temperature of the river to be evaluated, and the set time period includes a first time period and a second time period.
[0099] Among them, the set time period is the pre-set time period for the assessment of the river to be evaluated. For example, the river health of the river to be evaluated in the past 20 years can be taken as the first time period from nearly 20 years to nearly 10 years. The second time period is nearly 10 years. The first time period generally selects the year when human activities have the least impact on the river, and the first time period is used as the reference year...
Embodiment 2
[0191] Embodiment 2 of the present application proposes a river health evaluation device, such as Figure 5 As shown, it includes: an acquisition module 501 , a fitting module 502 , a determination module 503 and an evaluation module 504 .
[0192] The collection module 501 is used to collect the hydrological parameters of the river to be evaluated in the set time period, the hydrological parameters include the static flow, still water temperature, precipitation and air temperature of the river to be evaluated, and the set time period includes the first time period and second time period;
[0193] A fitting module 502, configured to fit the static flow and precipitation in the first time period according to the first set relationship between the static flow and the precipitation in the set time period to obtain a first fitting coefficient ; Fitting the static flow and precipitation in the second time period to obtain the second fitting coefficient;
[0194] And, according to...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com