Construction system and construction method for cable-stayed bridge main tower and steel anchor beams

A construction method, steel anchor beam technology, applied in cable-stayed bridges, bridges, bridge forms, etc., can solve the problems of narrow joist construction space and inability to install steel anchor beams, etc., to reduce the number of section construction times and shorten the construction period , The effect of reducing material waste

Pending Publication Date: 2018-07-24
BEIJING URBAN CONSTR ROAD & BRIDGE GROUP
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to provide a construction system and construction method for the main tower of a cable-stayed bridge and a steel anchor beam, so as to solve the problem that the construction space between the joists is too narrow and the lower steel anchor beam cannot be installed after the concrete pouring is completed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction system and construction method for cable-stayed bridge main tower and steel anchor beams
  • Construction system and construction method for cable-stayed bridge main tower and steel anchor beams
  • Construction system and construction method for cable-stayed bridge main tower and steel anchor beams

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] Hereinafter, embodiments of a construction system and a construction method for a main tower of a cable-stayed bridge and a steel anchor beam of the present invention will be described with reference to the accompanying drawings.

[0029] The examples described here are specific specific implementations of the present invention, and are used to illustrate the concept of the present invention. They are all explanatory and exemplary, and should not be construed as limiting the implementation of the present invention and the scope of the present invention. In addition to the embodiments described here, those skilled in the art can also adopt other obvious technical solutions based on the claims of the application and the contents disclosed in the description, and these technical solutions include adopting any obvious changes made to the embodiments described here. Replacement and modified technical solutions.

[0030] The accompanying drawings in this specification are sch...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction system and a construction method for a cable-stayed bridge main tower and steel anchor beams. The construction method for the cable-stayed bridge main tower andthe steel anchor beams comprises the following steps of step 1, mounting embedded steel plates and arranging the embedded steel plates on the top surface of a beam bracket; step 2, arranging a tower column steel internal template between the top surface of a lower supporting beam and the bottom surface of an upper supporting beam; step 3, mounting the lower part of a steel anchor beam temporary bracket on an existing building platform surface or a finished steel anchor beam top plate; and mounting a steel anchor beam corresponding to the lower supporting beam on the steel anchor beam temporarybracket before segmental concrete pouring of the main tower; and step 4, welding the steel anchor beam corresponding to the lower supporting beam with the embedded steel plate into place; and then mounting a steel anchor beam corresponding to the upper supporting beam and welding the steel anchor beam corresponding to the upper supporting beam with the corresponding embedded steel plate. According to the construction method for the cable-stayed bridge main tower and the steel anchor beams, as the mounting construction of the steel anchor beams is integrated into the construction of a tower column structure, the segmental construction frequency of the tower column is reduced, the method is beneficial for controlling the internal quality and appearance quality of the tower column structure,the construction period is reduced and material waste is reduced.

Description

technical field [0001] The invention belongs to the technical field of cable-stayed bridge construction, and in particular relates to a construction system and a construction method for a main tower and a steel anchor beam of a cable-stayed bridge. Background technique [0002] A cable-stayed bridge is a composite system bridge in which the tower is under compression, the cables are under tension, and the girder is under bending. The system can effectively reduce the height of the building structure, reduce the weight and save materials. Modern cable-stayed bridges occupy an important position in modern bridge structures due to their good structural performance, large spanning capacity, reasonable economic indicators and beautiful architectural shapes. Due to the advancement of modern structural theory, high-strength materials, computer technology and construction methods Make the cable-stayed bridge develop rapidly. [0003] The main tower of the cable-stayed bridge is th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D11/04
CPCE01D21/00E01D11/04
Inventor 孟庆敏李辉吉静涛
Owner BEIJING URBAN CONSTR ROAD & BRIDGE GROUP
Who we serve
  • R&D Engineer