Method for treating dust in underground coal mine roadway driving
An underground roadway and dust technology, which is applied in mine/tunnel ventilation, drilling equipment and methods, dust prevention, etc., can solve the problems of low efficiency, prone to disaster accidents, and large pollution, so as to improve the construction environment and avoid dust and gas disaster accidents, and the effect of improving construction efficiency
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2018-08-21
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to a method for controlling dust, which belongs to the technical field of coal mine mining, and in particular to a method for controlling dust in underground tunnels of coal mines. Background technique
[0002] Roadway excavation is an unavoidable production link in coal mine production. Whether it is rock roadway or coal roadway excavation, a large amount of dust and harmful gas pollution will be generated. Traditionally, the dust is removed by the compressor fan and the air tube, and a large amount of dust is often generated in the roadway after the roadway is excavated. Harmful gases such as dust and gas endanger the physical and mental health of workers, easily cause disasters and accidents, and reduce the efficiency of tunneling construction.
[0003] In order to solve the above problems, a kind of negative pressure ventilation and dust suction construction method for coal mine underground roadway excavation was designed by i...
Examples
Embodiment
[0031] Such as Figure 4 As shown, the coal mine underground roadway excavation negative pressure ventilation and dust suction construction process method of the present invention comprises the following steps:
[0032] Construction preparation steps: According to the pre-excavation space range and geological data of the roadway, the drilling trajectory of the directional and penetrating tunnel is precisely designed. The layout and extension of the central connection line of the excavation roadway.
[0033] Hole opening step: use drilling rig 1, flat-bottomed full-face drill bit and outer flat drill pipe, and drill 12-15m in rotation according to the design opening parameters.
[0034] The construction steps of directional pilot hole drilling: put in the measurement-while-drilling system 2, the screw motor deflection drilling tool 3 and the directional drill bit 4, and conduct directional drilling according to the design trajectory of the drilling hole. , azimuth, tool face ...