Method for treating dust in underground coal mine roadway driving

An underground roadway and dust technology, which is applied in mine/tunnel ventilation, drilling equipment and methods, dust prevention, etc., can solve the problems of low efficiency, prone to disaster accidents, and large pollution, so as to improve the construction environment and avoid dust and gas disaster accidents, and the effect of improving construction efficiency

CN108425698AActive Publication Date: 2018-08-21XIAN RES INST OF CHINA COAL TECH& ENG GROUP CORP
9 Cites 3 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Publication Date
2018-08-21

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention relates to a dust treatment method, belongs to the technical field of coal mining, and particularly relates to a method for treating dust in underground coal mine roadway driving. According to the method, a large amount of dust and gas and other harmful gases generated in roadway driving are discharged through a large-diameter tunneling cave drilling negative-pressure ventilation anddust removal, and the method is small in pollution and high in efficiency and can reduce the occurrence of disaster accidents.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to a method for controlling dust, which belongs to the technical field of coal mine mining, and in particular to a method for controlling dust in underground tunnels of coal mines. Background technique

[0002] Roadway excavation is an unavoidable production link in coal mine production. Whether it is rock roadway or coal roadway excavation, a large amount of dust and harmful gas pollution will be generated. Traditionally, the dust is removed by the compressor fan and the air tube, and a large amount of dust is often generated in the roadway after the roadway is excavated. Harmful gases such as dust and gas endanger the physical and mental health of workers, easily cause disasters and accidents, and reduce the efficiency of tunneling construction.

[0003] In order to solve the above problems, a kind of negative pressure ventilation and dust suction construction method for coal mine underground roadway excavation was designed by i...

Examples

Embodiment

[0031] Such as Figure 4 As shown, the coal mine underground roadway excavation negative pressure ventilation and dust suction construction process method of the present invention comprises the following steps:

[0032] Construction preparation steps: According to the pre-excavation space range and geological data of the roadway, the drilling trajectory of the directional and penetrating tunnel is precisely designed. The layout and extension of the central connection line of the excavation roadway.

[0033] Hole opening step: use drilling rig 1, flat-bottomed full-face drill bit and outer flat drill pipe, and drill 12-15m in rotation according to the design opening parameters.

[0034] The construction steps of directional pilot hole drilling: put in the measurement-while-drilling system 2, the screw motor deflection drilling tool 3 and the directional drill bit 4, and conduct directional drilling according to the design trajectory of the drilling hole. , azimuth, tool face ...