Overflow and anti-blocking dam structure for water conservancy projects
A water conservancy project and anti-clogging technology, which is applied in water conservancy projects, sea area projects, mechanical equipment, etc., can solve the problems of reduced flood discharge capacity, inability to use hydroelectric power generation, and inconvenient maintenance
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2018-11-23
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of water conservancy engineering, in particular to a dam body structure for overflow and blockage prevention of water conservancy engineering facilities. Background technique
[0002] At present, projects built to control and deploy surface water and groundwater in nature to achieve the purpose of eliminating harm and rejuvenating benefits are also called water projects; water is an indispensable and precious resource for human production and life, but its natural state It does not fully meet the needs of human beings. Only by building water conservancy projects can water flow be controlled, floods prevented, and water volume adjusted and distributed to meet the needs of people's lives and production for water resources. Common overflow dams are generally made of concrete Or mortar masonry, according to the type of dam, there are overflow gravity dam, overflow arch dam, overflow pier dam and overflow earth-r...
Examples
Embodiment Construction
[0015] The present invention will be further described below in conjunction with accompanying drawing:
[0016] Referring to the accompanying drawings: the dam body structure of the overflow anti-clogging dam of the water conservancy facilities in this embodiment includes a top body 6, a middle body 8 and a bottom body 10, and the top body 6 is provided with gate piers 3 A gate 4 is provided in the gate pier 3, a flowmeter 5 is provided at the bottom of the gate 4, a bridge 2 for installing the opening and closing equipment of the gate 4 is provided on the gate pier 3, and a control room 1 is provided above the bridge 2, The left part of the bridge 2 is provided with a water level gauge 22, the top body 6 is provided with an upper overflow curve section 32, and the middle body 8 of the dam is provided with a first overflow channel 7 and a second overflow channel from top to bottom. Flow channel 9, the middle straight section 33 is provided on the middle body 8 of the dam, the ...