Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Reserved project optimization method based on contribution degrees of power grid effects

A technology of contribution degree and project, which is applied in the field of quantitative evaluation and optimization of reserve projects based on the contribution degree of power grid performance, can solve the problems of weak analysis from an economic perspective, failure to consider the role and performance of the power grid, and lack of research on investment optimization combinations, etc., to achieve Improve work level and work efficiency, make precise investment, and promote the effect of scientific decision-making in power grids

Active Publication Date: 2018-11-23
STATE GRID CORP OF CHINA +3
View PDF3 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] First, under the influence of traditional thinking, only the feasibility and necessity analysis from the perspective of technology and safety is emphasized for power grid construction projects, and the analysis from the economic perspective is relatively diluted;
[0006] Second, there is a lack of analysis of uncertain influencing factors in the process of power grid project construction, as well as quantification of these influencing factors;
[0007] Third, the evaluation content and methods and dynamic optimization management of the power grid construction project reserve library need to be further improved;
[0008] Fourth, there is a lack of investment optimization portfolio research on the simultaneous implementation of multiple projects in the entire regional power grid
[0009] At present, the research on project evaluation mainly focuses on the post-evaluation work of projects that have been put into operation using methods such as fuzzy hierarchical analysis, expert scoring, and quantitative analysis of indicators. After the completion of the function and effect on the entire power grid, it is unable to provide technical support for the storage of reserve projects and inclusion in the investment plan

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Reserved project optimization method based on contribution degrees of power grid effects
  • Reserved project optimization method based on contribution degrees of power grid effects
  • Reserved project optimization method based on contribution degrees of power grid effects

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0182] in accordance with figure 2 The definition and calculation method of the basic indicators of the established evaluation system, and determine the relevant actual data:

[0183] Take the distribution network project constructed in a certain area as an illustration: there are 36 main transformers in this area, with a total capacity of 1134MVA; 279 lines, 97 lines that can pass the "N-1" verification, and there are 84 lines; load transfer capacity 256MW; line loss rate 28%; voltage qualification rate 73%; power supply reliability 0.16 times / (user·a); pollutant discharge 61.2μg / m3; grid power supply capacity 910MVA, The load is 750MW, the power grid assets are 1.2 billion yuan, the load rate of the main transformer is 52%, the load rate of the line is 76%, and the overload rate of the line is 32%. Through the Delphi method evaluation, the weight of the main transformer load rate index of the customer (municipal) urgent demand satisfaction index is 0.38, the weight of the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a reserved project optimization method based on contribution degrees of power grid effects. The method comprises the steps of S1, comprehensively collecting power grid reservedproject quantitative evaluation related data information, and establishing a reserved project evaluation index system based on the power grid effects; S2, according to the evaluation index system inthe step S1, analyzing and obtaining a quantitative calculation method for indexes; S3, performing calculation according to the evaluation index system and the quantitative method in the previous step, and by applying a principle of combining subjective and objective weights, determining a weight calculation method for the indexes in comprehensive contribution degree calculation; S4, according toa weight calculation formula in the step S3, carrying out single target optimization by adopting a particle swarm algorithm, and determining optimal weights; S5, according to the optimal weights in the step S4, calculating comprehensive contribution degrees of reserved projects, and carrying out dynamic sorting on the reserved projects by considering the influence on other reserved projects aftercompletion of the reserved projects in combination with the investment of the reserved projects, thereby completing the optimization of the reserved projects.

Description

technical field [0001] The invention relates to a method for optimizing a power grid project, in particular to a method for quantitatively evaluating and optimizing a reserve project based on the contribution degree of power grid performance. Background technique [0002] The marketization of electricity and the gradual deepening of the reform of the power enterprise system, the volatility of new energy power generation and the diversification of the main body of the external transmission project, coupled with the problems of large investment scale and long recovery time of the original power grid construction project, make the status of economic factors in decision-making At the same time, new features such as the complexity of decision-making factors, the increase of uncertain influencing factors and the diversification of decision-making subjects all pose new problems and challenges for the construction evaluation decision-making of power grid reserve projects. [0003] F...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/04G06Q50/06
CPCG06Q10/04G06Q10/06375G06Q50/06Y02E40/70Y04S10/50
Inventor 潘尔生刘自发李晖彭冬张鹏飞王智冬龙望成薛雅玮王旭阳蔡晓宇张哲
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products