Billing method for smart electric meters
A technology of smart meters and meters, applied in the field of meters, can solve problems such as only considering power failure, ignoring the impact, and inaccurate compensation settlement results, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0062] A smart meter settlement method, it comprises the following steps:
[0063] (1) The meter automatically judges whether a power failure occurs, or a time callback occurs, or an asynchronous settlement trigger command is received;
[0064] If power failure occurs, then enter step (2);
[0065] If time callback occurs, then enter step (7);
[0066] If an asynchronous settlement trigger instruction is received, proceed to step (11);
[0067] If none of the above three situations occurs, return to step (1) to continue judging;
[0068] (2) Judging whether one or more synchronous settlement periods are crossed during the power-off period;
[0069] If not, do not make supplementary settlement, and return to step (1);
[0070] If yes, go to step (3)
[0071] (3) Determine whether to enter or exit daylight saving time during power failure;
[0072] If entering daylight saving time during power-off, then enter step (4);
[0073] If exit daylight saving time during power-of...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


