A technology of pipe jacking and technology, applied in measuring devices, instruments, electrical and digital data processing, etc., can solve problems such as difficult to directly apply to pipe jacking construction, visualization, and low level of informatization, so as to facilitate judgment and decision-making, and improve visualization. , the effect of ensuring safety

Pending Publication Date: 2019-02-01
SHANGHAI FOUND ENG GRP
View PDF3 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, the monitoring of pipe jacking mainly focuses on the analysis of some data in the construction stage, such as segment stress and soil settlement. By drawing deformation curves and setting alarm values, it is convenient to guide the construction process; secondly, it is aimed at the safety of tunnels in the operation and maintenance stage. Carry out data monitoring; finally, the monitoring syst

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Monitoring method of pipe jacking construction process based on BIM technology
  • Monitoring method of pipe jacking construction process based on BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] The following is a detailed description of the monitoring and management system for the pipe jacking construction process based on BIM technology in conjunction with the accompanying drawings.

[0019] Such as figure 1 , as shown in 2, a monitoring method for the construction process of pipe jacking based on BIM technology, using a monitoring system for the construction process of pipe jacking based on BIM technology, the system includes information preset module, monitoring information collection module, BIM model import module, The monitoring information processing and analysis module, the data storage module, and the monitoring information output module, the specific steps are as follows:

[0020] Step 1: In the construction preparation stage, design the progress plan and monitoring plan for the construction organization, and complete the presetting of basic information: new project name, pipe jacking ring configuration, soil layer information, progress plan import, ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a monitoring method of pipe jacking construction process based on BIM technology, Adoption of monitoring system, the system comprises an information preset module, monitoringinformation acquisition module, BIM model import module, monitor information processing and analyze module, data storage module and monitoring information output module. That method comprises the following step: basic information preset, caisson, pipe jacking, monitoring point BIM modeling, monitoring information collection, establishing MDB data file and database center MYSQL, monitoring management interface composition, monitoring point data analysis. The invention can be used for the visual management of the monitoring data in the tunnel construction process, the monitoring data in the pipejacking construction process can be viewed in real time and intuitively, and the related monitoring data can be displayed simultaneously according to the monitoring data analysis, so as to facilitatethe judgment and decision-making of the site management personnel. So as to effectively solve the project data is not intuitive, poor correlation between the data, to ensure the safety of the construction process, to improve the visualization and informatization level of pipe jacking construction process monitoring.

Description

technical field [0001] The invention relates to the field of safety monitoring during tunnel construction, in particular to a monitoring method and system for the construction process of pipe jacking based on BIM technology. Background technique [0002] As a typical construction technology of urban trenchless (underground excavation) technology, pipe jacking construction is widely used in urban pipeline construction because it has little interference from the external environment, has little impact on the surrounding environment, and has a high degree of construction automation. Due to the adoption of pipe jacking construction in dense areas of large and medium-sized cities, it will inevitably cause construction disturbance to the soil around the pipeline, and then interfere with the normal operation of surrounding buildings (structures). effects have also received widespread attention. [0003] At present, the monitoring of pipe jacking mainly focuses on the analysis of s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F17/50G06F16/248G06Q50/08G01D21/02
CPCG06Q50/08G01D21/02G06F30/20
Inventor 周雪莲张海锋李耀良徐英武漏家俊袁海涛黄秋亮边志浩卢恺吕荪骐
Owner SHANGHAI FOUND ENG GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products