Piled drainage anchor rod retaining wall structure and construction method thereof
A pile-supported and retaining wall technology, which is applied in the field of geotechnical engineering, can solve problems affecting the safety of bridge pile foundations, deterioration of rock and soil strength on bank slopes, and unusability, so as to avoid reservoir water soaking and reduce the degree of impact. Technology advanced effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] see figure 2 , this embodiment discloses a pile-supported drainage anchor retaining wall structure, which is used to reinforce the slope outside the pile foundation of the bank slope bridge. see figure 1 with image 3 , The retaining wall structure includes a pile foundation 1, a beam 2, a retaining wall 3 and a plurality of anchor rods 4.
[0043] The pile foundation 1 includes a plurality of load-bearing piles 101 embedded in the bank slope stable rock and soil mass. The bearing piles 101 are arranged at intervals along the bank slope. The pile body of the load-bearing pile 101 is embedded in the stable rock-soil mass to provide vertical and horizontal bearing capacity for the structure. In actual production, when the pile foundation 1 is mainly used to provide vertical bearing capacity, the pile body of the bearing pile 101 is arranged vertically. When the pile foundation 1 needs to provide vertical and horizontal bearing capacity at the same time, some or all ...
Embodiment 2
[0049] This embodiment discloses a construction method for the pile-supported drainage anchor retaining wall structure described in Embodiment 1, which includes the following steps:
[0050] 1) According to the geological survey data, determine the construction position of the retaining wall structure.
[0051] 2) According to the designed pile position, size, reinforcement, strength grade, etc., choose an appropriate construction method to construct pile foundation 1.
[0052] 3) According to the designed beam size, reinforcement, strength grade, etc., select an appropriate construction method to construct the beam 2 to ensure that the beam 2 and the pile foundation 1 are firmly connected.
[0053] 4) Excavate and clean up slope rock and soil. According to the designed anchor bolt position, size, strength grade, etc., select an appropriate construction method to construct the anchor bolt 4, and ensure that the stressed steel bar of the anchor bolt 4 is exposed to a sufficient ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com