Manual warehouse cleaning protection device, warehouse cleaning equipment and warehouse cleaning method
A protective device and storage cleaning technology, applied in the direction of respiratory protection devices, chemical instruments and methods, cleaning methods and utensils, etc., can solve problems such as skin damage, safe movement, easy sweating, etc., to reduce occupational hazards and improve Work efficiency and the effect of ensuring comfort
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2020-10-13
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of cleaning large containers, in particular to a protective device for manual warehouse cleaning, equipment for cleaning warehouses and a method for cleaning warehouses. Background technique
[0002] Since the use of large vertical containers, due to the inherent holes of the container, such as measuring bin holes, machine installation holes, manhole doors, etc., the moisture in the material and air causes the material in the container to harden and harden under pressure. After a long time, the storage capacity will decrease. decrease. Hardened lumps, or the rope fell during measurement, or the maintenance tool fell to block the discharge port, and the material cannot be discharged smoothly. Seriously affect the production and economic benefits of enterprises. Therefore, it is necessary to clean the inside of the container, which mainly includes manual cleaning and machine cleaning.
[0003] The general m...
Examples
Embodiment 1
[0061] Such as figure 1 and figure 2 As shown, a protective device for manual warehouse clearance includes protective clothing and an air supply device. The protective clothing includes a head 1 and a body part 2. The glasses part of the head 1 is provided with a transparent window 3. The head An air outlet 4 is arranged on the left and right sides of the back of 1, and the air outlet 4 communicates with the outside through a one-way valve, and the head 1 is connected to an air supply device.
[0062] The head part 1 also includes a zipper part 5 , which can be opened to facilitate warehouse clearing personnel to expose the mouth, and the body part 2 includes a second zipper part 6 .
[0063] The head 1 wears a helmet 100 to improve protection safety.
[0064] The zipper part 5 is arranged at the facial oral cavity of the head 1 .
[0065] The present invention considers that the air quality inside the warehouse is poor, lacks oxygen, and there are corrosive gases. Therefo...
Embodiment 2
[0072] Such as Figure 2 to Figure 4 As shown, a warehouse clearing equipment includes a slide rail 13, an elevator is connected to the slide rail 13, and the elevator and the hanging basket 12 are connected by a steel rope 11, and the warehouse clearing personnel wear the protective clothing and enter the hanging basket 12 to carry out the cleaning work, and the air supply device supplies air to the protective clothing through the hanging basket 12.
[0073] Described slide rail 13 comprises steel pipe 130 and arc-shaped I-beam 131, and described steel pipe 130 is connected with storehouse wall 18 through the exhaust hole of warehouse wall 18, and described arc-shaped I-beam 131 is connected with described steel pipe 130 to form the The slide rail 13, the elevator is installed on the arc-shaped I-beam 131.
[0074] A support rod is also arranged below the steel pipe 130, forming a tripod with a triangular side with the steel pipe 130 and the storehouse wall 18.
[0075] The...
Embodiment 3
[0078] A warehouse clearing method, using the warehouse clearing equipment to clear the warehouse, comprises the following steps:
[0079] Step 1: enter through the manhole on the top of the warehouse and install steel pipes 130 at intervals on the warehouse wall 18;
[0080] Step 2: install arc-shaped I-beams 131 on the steel pipe 130, so that the arc-shaped I-beams 131 are distributed along the circumferential direction of the warehouse wall 18 to form slide rails 13;
[0081] Step 3: Install an elevator on the slide rail 13, the elevator is connected to the hanging basket 12, and the elevator moves on the slide rail 13; a secondary protective frame 14 for sliding connection is also provided on the upper end of the slide rail 13, The secondary protective frame 14 is connected with the elevator, and the speed difference anti-dropping device 17 is set on the secondary protective frame 14, and the speed difference anti-falling device 17 passes through the Dyneema rope 16 and th...