Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

BIM-based house building construction supervision method

A technology of building construction and housing construction, applied in the field of BIM-based housing construction supervision, can solve the problems of inability to improve construction efficiency, complicated process, and reduce construction cost, and achieve the goals of shortening the construction period, simple and easy-to-understand process, and improving construction efficiency Effect

Pending Publication Date: 2021-02-12
ZHEJIANG BAOLONG CONSTR
View PDF1 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The above-mentioned patents have the advantages of improving the safety of building construction, effectively avoiding errors in subsequent unconstructed parts, and improving the safety warning ability during the building construction process, but they also have defects, such as: the method is cumbersome and cannot improve the construction efficiency. Efficiency, reduce construction cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based house building construction supervision method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0027] A BIM-based housing construction supervision method, comprising the following steps:

[0028] Step 1. Establish a BIM system: input the original data of housing construction into the construction supervision system, establish a BIM system based on the original data of housing construction, and simulate construction on a building simulator based on the BIM system. The building simulator includes construction modules, supervision module and control module, setting simulation parameter information and threshold information in the construction module and supervision module;

[0029] Step 2. Simulate building construction: scale down the size information in the original data of the building construction and simulate the construction according to the reduced size information. After the construction is completed, the simulated building is obtained. The supervision module scales the size information of the simulated building and compares it with The size information of the orig...

Embodiment 2

[0045] A BIM-based housing construction supervision method, comprising the following steps:

[0046] Step 1. Establish a BIM system: input the original data of housing construction into the construction supervision system, establish a BIM system based on the original data of housing construction, and simulate construction on a building simulator based on the BIM system. The building simulator includes construction modules, supervision module and control module, setting simulation parameter information and threshold information in the construction module and supervision module;

[0047] Step 2. Simulate building construction: scale down the size information in the original data of the building construction and simulate the construction according to the reduced size information. After the construction is completed, the simulated building is obtained. The supervision module scales the size information of the simulated building and compares it with The size information of the orig...

Embodiment 3

[0060] A BIM-based housing construction supervision method, comprising the following steps:

[0061] Step 1. Establish a BIM system: input the original data of housing construction into the construction supervision system, establish a BIM system based on the original data of housing construction, and simulate construction on a building simulator based on the BIM system. The building simulator includes construction modules, supervision module and control module, setting simulation parameter information and threshold information in the construction module and supervision module;

[0062] Step 2. Simulate building construction: scale down the size information in the original data of the building construction and simulate the construction according to the reduced size information. After the construction is completed, the simulated building is obtained. The supervision module scales the size information of the simulated building and compares it with The size information of the orig...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a BIM-based house building construction supervision method which is characterized by comprising the following steps that 1, a BIM system is established: house building construction original data are input into a construction supervision system, the BIM system is established according to the house building construction original data, simulation construction is conducted on abuilding simulator based on the BIM system, the building simulator comprises a construction module, a supervision module and a control module, and Simulation parameter information and threshold valueinformation are set in the construction module and the supervision module; and 2, building construction is simulated: the size information in the house building construction original data is scaled down and simulation construction is performed according to the scaled-down size information to obtain a simulated building after the construction is completed; the effects of improving the constructionefficiency and the construction quality, saving the construction cost and shortening the construction period are achieved.

Description

technical field [0001] The invention belongs to the field of house construction, and in particular relates to a BIM-based method for supervising house construction. Background technique [0002] BIM is the English acronym for Building Information Modeling. It uses the relevant information data of the construction project as the basis of the model to establish the building model, and simulates the real information of the building through digital information simulation. It has eight characteristics of completeness of information, relevance of information, consistency of information, visualization, coordination, simulation, optimization and graphing. At present, my country is in a period of rapid economic development, and the construction industry is also driven Development, in order to better develop the construction industry, it is necessary to continuously improve the monitoring construction technology, so that the safety and supervision problems in the construction can be we...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F30/13G06F30/20G06Q10/10G06Q50/08
CPCG06F30/13G06F30/20G06Q10/103G06Q50/08
Inventor 陈琪张坚尹伟王贞贞王巧挺
Owner ZHEJIANG BAOLONG CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products