Asymmetric cable-stayed bridge side span section ground anchor prestress equivalent counterweight system and construction method

An asymmetric and prestressed technology, applied in the direction of cable-stayed bridges, bridges, bridge parts, etc., can solve the problems of long construction period, large working area, difficulty in cable-stayed bridge design and increased complexity of checking calculation, etc., and achieve fast construction Safety, good economy, and the effect of overcoming complex design and construction

Inactive Publication Date: 2021-03-19
ANHUI HIGHWAY BRIDGE ENG CO LTD +1
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The design of the asymmetric cable-stayed structure system generally considers the counterweight of the side span, that is, the main girder of the side span adopts a concrete structure, the main span adopts a steel structure, and the conventional construction adopts an auxiliary temporary support system for concrete pouring, which has a long construction period and a large working area. The stress of the side main span under self-balancing conditions increases the difficulty of design and the complexity of checking calculation of cable-stayed bridges

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Asymmetric cable-stayed bridge side span section ground anchor prestress equivalent counterweight system and construction method
  • Asymmetric cable-stayed bridge side span section ground anchor prestress equivalent counterweight system and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention.

[0025] refer to Figure 1-2 , the equivalent counterweight system of prestressed ground anchors in the side spans of asymmetric cable-stayed bridges, the prestressed tendons of the ground anchors and the cable stays are anchored on the main girders of the side spans at the same time, forming a force balance with the completed main girder structure state.

[0026] refer to Figure 1-2 Auxiliary piers are generally designed on the side spans of asymmetrical cable-stayed bridges, and the caps of the auxiliary piers are provided with ground anchor holes. The bottom of the ground anchor holes of the auxiliary piers is pre-embedded with anchor end fittings, and the anchor...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an asymmetric cable-stayed bridge side span section ground anchor prestress equivalent counterweight system, and aims to solve specific technical problems that an asymmetric single-tower double-cable-plane cable-stayed bridge is short in side span and a cable bent tower bears unbalanced force due to the fact that main span beams and side span beams are different in length.The specific construction method comprises the steps that when the main beam is constructed, the stay cables are anchored in the rock stratum soil under the beam block at the same position in the vertical direction after side span, certain prestress is applied to the ground anchor, a prestress anchoring system can be directly pre-buried at the auxiliary pier in the construction process, and a novel equivalent balance weight structure system is formed. The structure has better economical efficiency, is convenient to construct and safe and reliable in structure, reduces the counterweight concrete material of the side span section of the traditional asymmetric cable-stayed bridge, and overcomes the defect of complex design and construction of a large temporary support for construction.

Description

technical field [0001] The invention relates to the technical field of foundations in civil engineering, bridge hydraulic structures and construction methods for the foundations, in particular to a ground anchor prestressed equivalent counterweight system and a construction method for side-span sections of asymmetrical cable-stayed bridges. Background technique [0002] The cable-stayed bridge is a long-span structure, and different layout methods can be adopted for different geological and terrain conditions. Generally, the cable-stayed structure is arranged in a symmetrical straight line, and the load transmitted by the bridge deck can be balanced by the tower girder; but for the single tower foundation setting under special geological conditions, the convenience of construction and other factors must be considered, and the cable-stayed bridge is often set as an asymmetric cable-stayed bridge. cable structure system. [0003] The design of the asymmetric cable-stayed stru...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D19/00E01D11/04E02D5/80E01D21/00
CPCE01D19/00E01D11/04E02D5/80E01D21/00
Inventor 戴良军崔林钊彭申凯骆西胜刘晓晗沈维成崔健徐磊危明
Owner ANHUI HIGHWAY BRIDGE ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products