Drill pipe removal device and drill pipe removal process for anti-sand and water-freezing pipes in subway tunnel construction
A technology for tunnel construction and water freezing, which is applied in earthwork drilling, wellbore/well components, sealing/isolation, etc. It can solve problems that affect the smooth progress of construction, sand inrush and water leakage, etc., so as to improve construction efficiency and ensure sealing sexual effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Drill pipe extraction device for anti-sand and water-freezing pipes in subway tunnel construction, such as Figure 4 and Figure 5 As shown, it includes a sealing mechanism 3, a pulling rod mechanism and a driving mechanism;
[0041] The sealing mechanism 3 includes a rubber plug 14 and a flange 15, there are two flanges 15, the rubber plug 14 is fixedly installed between the two flanges 15, and the rubber plug 14 and the flange 15 are fixedly installed together to form a flange rubber seal The diameter of the flange 15 is matched with the inner diameter of the drill pipe 1 to be removed so that the flange 15 is matched with the inner wall of the drill pipe 1 to be removed; the flange rubber seal is fixedly installed at the nozzle of the drill pipe 1 to be removed , and cooperates with the sealing between the inner wall of the drill rod 1 to be pulled out; the outer end face of the flange rubber seal is movably connected with the hydraulic cylinder 4 of the rod pulling...
Embodiment 2
[0048] Drill pipe extraction device for anti-sand and water-freezing pipes in subway tunnel construction, such as Image 6 As shown, it includes a sealing mechanism 3, a pulling rod mechanism and a driving mechanism;
[0049] The sealing mechanism 3 includes a rubber plug 14 and a flange 15, there are two flanges 15, the rubber plug 14 is fixedly installed between the two flanges 15, and the rubber plug 14 and the flange 15 are fixedly installed together to form a flange rubber seal The diameter of the flange 15 is matched with the inner diameter of the drill pipe 1 to be removed so that the flange 15 is matched with the inner wall of the drill pipe 1 to be removed; the flange rubber seal is fixedly installed at the nozzle of the drill pipe 1 to be removed, and Sealing cooperation with the inner wall of the drill rod 1 to be pulled out; the outer end face of the flange rubber seal is vertically connected with the support rod 11 of the rod pulling mechanism;
[0050] The pull-...
Embodiment 3
[0055] The process of pulling out the drill pipe of the freezing pipe for preventing sand gushing and water escaping during subway tunnel construction includes the following steps:
[0056] Step A: The drilling is completed; the length of each section of the drill pipe used is 1.5 meters, and the drill pipe and the drill bit 9 are connected by the thread 20, see figure 1 ;
[0057] Step B: After the drilling is completed, insert the screw unloading rod 22 and fix it relatively through the clamping groove 21, rotate the screw unloading rod 22, unscrew the drill bit 9 and the drill rod 1 to be pulled out, and disconnect the thread 20, see figure 2 ;
[0058] Step C: Insert the no-extraction tube 2 into the cavity of the drill pipe and extend into the bottom of the drilled hole, see image 3 ;
[0059] Step D: The drill pipe 1 to be pulled out is pulled out of the drilled hole by using the drill pipe pulling device for preventing sand gushing and water freezing in the subway ...