Combined type loess stratum shield tunnel construction full-stage test device capable of uniformly humidifying
A technology of shield tunnel and test device
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] exist Figure 1~5 Among them, the present invention relates to a combined loess layer shield tunnel construction test device that can be uniformly humidified. Two sets of side plates 2 are vertically arranged on the front and rear sides of the bottom plate 1, and the two sets of side plates 2 are opposite to the side walls. The upper interval is correspondingly processed with several sets of card slots 3, and four sets of detachable partitions 4 are installed in the card slots 3. The side panels 2 and the detachable partitions 4 are transparent organic glass plates, which are convenient to use high-speed cameras 21 to capture and monitor construction. During the process, the observation surface of the tunneling chamber is affected by the construction process. Since the device is used for the humidification test, it needs to have a certain waterproof function, and the connection between the detachable partition 4, the side plate 2, and the bottom plate 1 is filled with s...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


