Multi-stage telescopic operation method for monitoring hole sealing quality of exploration hole in mudstone stratum

An operation method and telescopic technology, applied in underground chambers, earth-moving drilling, wellbore lining, etc., can solve the problem of long-term monitoring of the sealing quality of exploration holes in mudstone formations, inability to fully understand the conditions in the holes, and inability to change the humidity in the holes. Monitoring and other issues to achieve the effect of reasonable and effective monitoring work, improving availability and reliability, and contributing to safety and quality

Active Publication Date: 2021-12-31
CHINA RAILWAY 16TH BUREAU GRP CO LTD +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In order to overcome the fact that the existing shield construction monitoring device and its operation method cannot carry out long-term monitoring of the sealing quality of the exploration hole in the mudstone formation, cannot monitor the humidity change in the hole, cannot fully understand the situation in the hole, and cannot be used for the exploration of the mudstone formation The problem of hole sealing quality monitoring can realize long-term monitoring and early warning of the sealing quality of exploration holes in mudstone formations, and effectively improve the safety and quality of shield construction. The invention provides a method for monitoring the quality of sealing holes in mudstone formation exploration holes. The multi-stage telescopic operation method can not only be used for long-term monitoring of the sealing quality of exploration holes, but also has the functions of intelligent early warning, underground positioning, and data transmission, which can ensure the safety of shield construction in mudstone formations

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-stage telescopic operation method for monitoring hole sealing quality of exploration hole in mudstone stratum
  • Multi-stage telescopic operation method for monitoring hole sealing quality of exploration hole in mudstone stratum
  • Multi-stage telescopic operation method for monitoring hole sealing quality of exploration hole in mudstone stratum

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0050] The present invention will be further described below with reference to the accompanying drawings.

[0051] Refer Figure 1 ~ 22 , Multi-stage method of operating a retractable sealing exploration hole for quality monitoring shale formation, comprising the steps of:

[0052] (1) the deployment apparatus, as follows:

[0053] 1.1 excavation hole exploration, according to the needs and design exploration, determination exploration hole 28 is 31 m depth using XY-100 drill rig excavation exploration holes 28, 28 exploration hole diameter 100mm.

[0054] 1.2 determination of lowering depth. The core samples obtained after 28 exploration excavation hole depth determining apparatus 22 is substantially decentralized to 23 meters, it is located 36 weathered shale calcareous soil.

[0055] 1.3 determine the key parameters of the device. The diameter of the exploration hole 28, 29 is determined decentralized multiplex grouting pipe length 32m, multiplexed with 800mm diameter tube wall ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a multi-stage telescopic operation method for monitoring the hole sealing quality of an exploration hole in a mudstone stratum. The method comprises the following steps: (1) carrying out device deployment, and excavating the exploration hole; determining the lowering depth of the device; according to the diameter of the exploration hole, determining the length and the outer wall diameter of a lowering grouting reuse pipe, the inner wall diameter of the reuse pipe and the diameter and the height of a monitoring device shell; carrying out preparation for lowering; carrying out lowering and scanning the hole wall; conducting grouting; lowering a monitoring device; unfolding the monitoring device; continuing grouting; sealing the top; (2) monitoring and early warning: at a certain moment, due to poor hole sealing quality, enabling surface water to seep down along the exploration hole so as to increase the humidity in the exploration hole; and when a top hygrometer and a side hygrometers monitor humidity change, triggering humidity early warning, and enabling early warning information to be transmitted to a ground monitoring station through ultrasonic receiving and transmitting sonar. The method can be used for long-term monitoring of the sealing quality of the exploration hole, has the functions of intelligent early warning, underground positioning and data transmission, and can guarantee the construction safety of a shield in a mudstone-containing stratum.

Description

Technical field [0001] The present invention belongs to the field of shield construction technology, and more particularly to a multi-stage telescopic operation method for monitoring the sealing quality of the mudstone formation exploration hole. Background technique [0002] The underground space is a valuable resource of a city. In recent years, as people's demand for travel is growing, the ground road traffic has not satisfied people's needs, and many cities have begun to explore underground rail transit to subway. The subway construction is inseparable from the shield tunnel construction. Since the shield construction needs to pass many formations, detailed engineering geological surveys must be performed before construction. [0003] Drilling is a common means of engineering geological surveys. After the drilling is completed, we should cover the exploration holes, otherwise the rain water in the ground will penetrate into the formation along the exploration hole, affect the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D9/06E21D11/10E21D11/38
CPCE21D9/003E21D9/0607E21D11/10E21D11/381Y02W30/91
Inventor 贾茁刘永韩业华陈亮荣浩然林永星刘文强李超莫林飞张佳文
Owner CHINA RAILWAY 16TH BUREAU GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products