Method for forming cluster network based on proxy change
A network and cluster technology, which is applied in the field of cluster network based on agent change, can solve the problems of air interface transmission waste, long collection cycle, resource consumption, etc., and achieve the effects of improving efficiency, compact network topology, and reducing overhead
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0112] Embodiment 1: This embodiment is a preferred embodiment of the broadband micropower wireless intelligent meter reading initial routing structure of the present invention. See Figure 8 and Figure 9 ( Figure 8 Represents the CCO initial routing construction flow diagram, Figure 9 A STA initial routing construction flow chart), the route construction method of the present embodiment includes the routing structure of the CCO and the routing of the STA:
[0113] CCO routing structure:
[0114] 1) After the CCO is powered on, obtain the MAC address, configure the white list, broadcast beacon frame and network notification packets, and wait for the receiving site request to enter the network;
[0115] 2) After the CCO receives the request to enter the network, parse the MAC address and routing relationship in the message and assign TEI;
[0116] 1) CCO determines whether the network maintenance message sent by the Network Maintenance Timer is turned on if the network maintenance t...
Embodiment 2
[0130] Example 2: This embodiment is a preferred embodiment of a proxy change request for broadband micro power wireless intelligence of the present invention, see Figure 10 ~ 13 .
[0131] 1) Site timing traversal route in the table is better than the current path, if there is existence, pick it out, such as the sort table is waiting for sorting;
[0132] 2) Site for sorting and starting from 1 setting equal level value, selecting the smallest level value as the new route, the number of the same level value exceeds 5, then select 5 paths.
[0133] 3) Site Select new route, construct and initiate a proxy change request message, wait for the receiving agent change request confirmation message;
[0134] 4) After the CCO receives the proxy change request message, parses the new agent site and the old site carried in the message, and determines if the proxy changes are allowed. If allows, select a new agent site constructor change request confirmation result field to fill in 1 And sen...
Embodiment 3
[0137] Example 3: This example is a network topology after the broadband micro power wireless smart meter meter agent change is completed, see Figure 12 . This network topology is only used to illustrate the method of applying the agent change of the intelligent meter reading network of the present invention, and is not limited to the application scenarios of the present invention, which will apparent to those skilled in the art. Compared Figure 7 The network topology and network topology after the start of the network Figure 13 Complete the network topology after the agent, add a compact, large number of PCOs between sites, reduce the level of the site, so that the efficiency of the meter reading and reduces the congestion transmitted in the null.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com