Process for improving soil quality of saline-alkali soil
A soil and soil quality technology, which is applied in the direction of soil conditioning materials, chemicals for biological control, and other chemical processes, can solve the problems of large basic investment, high technical requirements, and large economic investment, and achieve the benefits of plant growth and regulation. Effects of soil compaction, control of fertilizer efficiency and fertility
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2022-04-12
Smart Images

Figure 1 
Figure 2
Abstract
Description
technical field
[0001] The invention relates to the technical field of soil improvement technology, in particular to a technology for improving saline-alkaline soil quality. Background technique
[0002] At present, the total area of saline-alkali soil in my country is about 36 million hm 2 , accounting for 4.88% of the country's usable land area. Today, when the area of arable land is decreasing, the population is expanding, and the available fresh water resources are becoming increasingly scarce, saline-alkali land, as a reserve resource for potential arable land, has great potential for development. The physical and chemical properties of saline-alkali soil are bad, which not only leads to the reduction of soil productivity, but also causes many environmental problems. Therefore, the improvement of saline soil is becoming more and more important. At present, the improvement measures of saline-alkali land mainly include physical methods, chemical methods and biologica...
Examples
Embodiment 1
[0025] A kind of technique for improving saline-alkaline soil quality, comprises the following steps:
[0026] 1) if figure 1 As shown, several (depth is 30cm, width is 50cm) main trenches 1 and (depth is 30cm, width is 20cm) branch trenches 2 are dug in the land, and the interval between main trenches 1 is 6m, each main trench The two sides of ditch 1 are dug to be provided with border ditch 3, and main ditch 1 and branch ditch 2 vertically intersect in the middle of furrow ditch 3, and each branch ditch 2 is parallel to each other; The water well 5 and the branch ditch 2 are connected with the main blind ditch 4, and the main blind ditch 4 is connected with the water collection well 5; the gradient between the main blind ditch 4 and the water collection well 5 is 1:10.
[0027] 2) in the main ditch 1 and the branch ditch 2, the permeable tobacco sterilizing powder is filled, and the surface of the tobacco sterilizing powder is backfilled with saltpeter to obtain the saltpet...
Embodiment 2
[0032] A kind of technique for improving saline-alkaline soil quality, comprises the following steps:
[0033] 1) if figure 1 As shown, some (depth is 35cm, width is 55cm) main trenches 1 and (depth is 35cm, width is 30cm) branch trenches 2 are dug in the land, and the interval between main trenches 1 is 7m. The two sides of ditch 1 are dug to be provided with border ditch 3, and main ditch 1 and branch ditch 2 vertically intersect in the middle of furrow ditch 3, and each branch ditch 2 is parallel to each other; The water well 5 and the branch ditch 2 are connected with the main blind ditch 4, and the main blind ditch 4 is connected with the water collection well 5; the gradient between the main blind ditch 4 and the water collection well 5 is 1:10.
[0034] 2) Fill the main ditch 1 and the branch ditch 2 with permeable tobacco sterilizing powder, and backfill with saltpeter to obtain a saltpeter layer; wherein, the tobacco sterilizing powder includes the following raw mate...
Embodiment 3
[0039] A kind of technique for improving saline-alkaline soil quality, comprises the following steps:
[0040] 1) if figure 1 As shown, several (depth is 40cm, width is 60cm) main ditch 1 and (depth is 40cm, width is 35cm) branch ditch 2 are dug in land, and the interval between main ditch 1 is 10m, each main ditch The two sides of ditch 1 are dug to be provided with border ditch 3, and main ditch 1 and branch ditch 2 vertically intersect in the middle of furrow ditch 3, and each branch ditch 2 is parallel to each other; The water well 5 and the branch ditch 2 are connected with the main blind ditch 4, and the main blind ditch 4 is connected with the water collection well 5; the gradient between the main blind ditch 4 and the water collection well 5 is 1:10.
[0041] 2) Fill the main ditch 1 and the branch ditch 2 with permeable tobacco sterilizing powder, and backfill with saltpeter to obtain a saltpeter layer; wherein, the tobacco sterilizing powder includes the following r...