BIM + GIS technology-based construction management system and method for power substation

A construction management and substation technology, applied in the baseband system, baseband system components, transmission system, etc., can solve problems such as insufficient anti-interference ability and difficulties, so as to avoid unsafe behaviors, improve weakening problems, and achieve simple effects

Pending Publication Date: 2022-04-19
STATE GRID JIANGSU ELECTRIC POWER ENG CONSULTING CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] The carrier signal is simple and convenient to implement, but the anti-interference abi

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM + GIS technology-based construction management system and method for power substation
  • BIM + GIS technology-based construction management system and method for power substation
  • BIM + GIS technology-based construction management system and method for power substation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] Embodiments of the present invention are described in detail below, examples of which are shown in the drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the figures are exemplary only for explaining the present invention and should not be construed as limiting the present invention.

[0036] Those skilled in the art will understand that unless otherwise stated, the singular forms "a", "an", "said" and "the" used herein may also include plural forms. It should be further understood that the word "comprising" used in the description of the present invention refers to the presence of said features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, Integers, steps, operations, elements, components, and / or groups thereof. It will be understoo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a BIM + GIS technology-based construction management system and method for a power substation. The system comprises a data processing center, a positioning system, a model acquisition module, an alarm device, a modeling system and a communication module. According to the construction management system based on the BIM and the GIS, real-time monitored information can be converted into data indication in modeling, so that the construction process can be vividly displayed, engineering operation can be reminded and engineering construction can be indicated in time by monitoring engineering construction, unsafe behaviors in the voltage withstanding test process of the transformer substation are fundamentally avoided, and the safety of the transformer substation is improved. Through GIS positioning, the operation position of a worker on a construction site can be accurately positioned.

Description

technical field [0001] The invention relates to a construction management system and method based on BIM+GIS technology for power substations, belonging to the technical field of construction engineering management. Background technique [0002] The construction schedule management and cost management of engineering projects are important links in engineering project management. The characteristics of traditional schedule management methods and cost management methods, such as information lag and low degree of informatization, restrict the development of engineering schedule management. Building information model, referred to as BIM (building information modeling), BIM technology has the characteristics of informatization and visualization. The application of BIM-based construction progress information management mode in construction projects can improve the management level of such projects, and then improve the efficiency of projects. The overall value is significant. [...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F30/13G06F30/20G06F16/29H04L25/03
CPCG06F30/13G06F30/20G06F16/29H04L25/0328
Inventor 谢洪平黄涛杜长青林冬阳余鹏杨永前曹盛朱雯瑞
Owner STATE GRID JIANGSU ELECTRIC POWER ENG CONSULTING CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products