Mountain pedestrian path excavation-free mechanical construction method

A construction method and technology of mountain people, applied in infrastructure engineering, construction, bridge construction, etc., can solve the problems of low material transportation efficiency, high hoisting safety risks, and many uncertain factors, saving ecological restoration costs and construction mechanization. The effect of high degree of safety and quality improvement

Pending Publication Date: 2022-05-03
中建五局第三建设有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In order to ensure the landscape effect during the line selection of this type of project, the mountain where the line is located is generally a steep slope with a certain slope, and the vegetation along the line is lush. Due to the special geographical environment of the project, during the construction process, the original The destruction of the mountain made it impossible for conventional machinery and equipment to work in the mountain, and it was extremely difficult to transport materials and equipment
Due to the novel form of the project and relatively little construction experience, such projects that have been completed are generally installed and transported by traditional methods such as pole-pulling hoisting and cableway transportation. There are many uncertain factors faced by the line transfer, and there are disadvantages such as greater impact on the ecological environment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Mountain pedestrian path excavation-free mechanical construction method
  • Mountain pedestrian path excavation-free mechanical construction method
  • Mountain pedestrian path excavation-free mechanical construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0022] In addition, the technical solutions of the various embodiments of the present invention can be combined with each other, but it must be based on the realization of those skilled in the art. When the combination of technical solutions is contradictory or cannot be realized, it should be considered as a combination of technical solutions. Does not exist, nor is it within the scope of protection required by the present invention.

[0023] Such as...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

An excavation-free mechanical construction method for a mountain pedestrian path comprises the steps that a bridge deck starting section footpath and a bridge deck track are installed at an entrance of a construction section, and a bridge deck crane and a beam transporting trolley are installed on a bridge deck of the starting section. The bridge deck crane is driven to the top of the pre-installed steel pipe crossing column, and the bridge deck crane is anchored; the remote control beam transporting trolley transports the components to the operation range of the bridge deck crane from the entrance through the bridge deck track, and the bridge deck crane lifts the components from the beam transporting trolley for steel pipe column installation; then sequentially installing a middle-span section steel beam, a column top section steel beam, a secondary component and a track; according to the method, the installed mountainous region pedestrian path bridge floor is used as an equipment hoisting operation foundation and a driving transportation channel, so that the influence of the original natural environment is avoided, and the purpose that the whole line is mechanically constructed without excavating and damaging a mountain body is achieved.

Description

technical field [0001] The invention relates to an excavation-free mechanized construction method for a mountain footpath. Background technique [0002] The mountain trail project integrates "leisure", "fitness", "tourism" and "entertainment". interest. In order to ensure the landscape effect during the line selection of this type of project, the mountain where the line is located is generally a steep slope with a certain slope, and the vegetation along the line is lush. Due to the special geographical environment of the project, during the construction process, the original The destruction of the mountain made it impossible for conventional machinery and equipment to work in the mountain, making material transportation and equipment handling extremely difficult. Due to the novel form of the project and relatively little construction experience, such projects that have been completed are generally installed and transported by traditional methods such as pole-pulling hoisti...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D19/00E01D19/12E01D19/06E01D2/04E02D27/12E02D27/14
CPCE01D21/00E01D19/00E01D19/125E01D19/06E01D2/04E02D27/12E02D27/14
Inventor 刘思嘉夏禹涵黎亚军徐增武戴超虎
Owner 中建五局第三建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products