Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

893 results about "Footpath" patented technology

A footpath (also pedestrian way, walking trail, nature trail) is a type of thoroughfare that is intended for use only by pedestrians and not other forms of traffic such as motorized vehicles, cycles, and horses. They can be found in a wide variety of places, from the centre of cities, to farmland, to mountain ridges. Urban footpaths are usually paved, may have steps, and can be called alleys, lanes, steps, etc.

Sidewalk vehicle illegal parking detection method based on target detection and semantic segmentation

ActiveCN111368687AAccurately identify illegal parking and call the policeReduce human errorCharacter and pattern recognitionNeural architecturesPattern recognitionParking area
The invention discloses a sidewalk vehicle illegal parking detection method based on target detection and semantic segmentation, and belongs to the field of deep learning and computer vision, and themethod comprises the steps: respectively training a semantic segmentation network and a target detection network at a training stage, and obtaining a semantic segmentation model and a target detectionmodel; the method comprises the following steps of: extracting an urban road background image by using a Gaussian mixture background model; the method comprises the following steps: acquiring a semantic segmentation model, performing semantic segmentation by using a semantic segmentation algorithm and the semantic segmentation model to obtain a semantic segmentation graph, judging whether a camera rotates or not by using a perceptual hash algorithm, performing vehicle detection by using a target detection algorithm and the target detection model, marking a vehicle detection frame, and finallycomparing the vehicle detection frame with the semantic segmentation graph. The problems that an existing vehicle illegal parking detection method is high in misjudgment rate and poor in real-time performance, a sidewalk illegal parking area needs to be manually calibrated, and when a camera rotates, the illegal parking area needs to be manually calibrated again, so that the camera is not suitable for rotating are solved.
Owner:成都市微泊科技有限公司 +1

Binjiang touring type wetland revegetation mode structure

InactiveCN103526717AEcology hasHave a budgetClimate change adaptationCoastlines protectionRevegetationBrick
The invention discloses a Binjiang touring type wetland revegetation mode structure. The Binjiang touring type wetland revegetation mode structure is characterized in that in a river bank, an aquatic plant purifying region is arranged below a high water level, a water edge soil fixation and erosion preventing region is arranged above the high water level, and an overwater forest recovery region is arranged on one far-water side outside the erosion preventing region. In the aquatic plant purifying region, aquatic floating-leaved plants are planted below a normal water level in a naturally scattered growth and close planting mode, and high-stalk emerged plants are planted above the normal water level and below the high water level in a naturally scattered growth and close planting mode. The water edge soil fixation and erosion preventing region is paved with slope protection bricks and the width of the water edge soil fixation and erosion preventing region ranges from 2m to 3m. The overwater forest recovery region is of an ecological simulation community structure formed by natural mixing of wetland trees and shrubs to achieve height matching, color combination, advantage and disadvantage complementation and calobiosis. Touring footpaths and seats for rest are naturally arranged in the river direction in communities. Through meticulous engineering design and scientific plant matching, the Binjiang touring type wetland revegetation mode structure achieves perfect combination of Binjiang hydraulic engineering and wetland revegetation, is important for river bank wetland soil fixation and erosion preventing and environment improvement, and has the advantages of being ecological, beautiful and multifunctional and increasing effect.
Owner:JINLING INST OF TECH

Positioning parking and antitheft system and management method for shared bicycles

The invention discloses a positioning parking and antitheft system and a management method for shared bicycles. The positioning parking and antitheft system and the management method have the advantages that spaces of sidewalks do not need to be occupied for constructing ground piles, only certain parking positioning labels need to be arranged on the ground, location data can be recorded, the positioning parking and antitheft system and management systems can be operated in a matched manner, and accordingly the problem of chaotic parking of bicycles can be effectively solved; accurate GPS (global positioning system) location information with parked bicycle location errors smaller than 1 meter can be obtained by the positioning parking and antitheft system, accordingly, the locations of theavailable shared bicycles can be accurately labeled on electronic maps by the positioning parking and antitheft system, and users can conveniently search and use the bicycles; the positioning parkingand antitheft system can start to give an alarm for realizing antitheft effects when the shaking or vibration frequencies of the bicycles reach set frequencies, the GPS location data can be regularlyacquired by a GPS positioning module when the continuous alarm frequencies and time reach set thresholds, and can be transmitted to a cloud host, information can be transmitted by the cloud host according to displacement after confirmation is carried out, antitheft devices of the bicycles can be instructed to transmit electronic pulse signals, warning sound can be continuously produced when necessary, and accordingly the stolen bicycles can be timely found by regional management personnel and public security officers.
Owner:安康市汉滨区易智网络科技有限公司

Construction method for field plot trial of fertilizer application to paddy fields

The invention discloses a construction method for a field plot trial of fertilizer application to paddy fields. Through the selection of a test field, ridges of plots and footpaths are constructed by repeatedly settling moist soil in a paddy field; a plot irrigation mode that main grooves are connected with small grooves is adopted so as to increase the repeated treatment times of each plot; the plots are set in a block so as to ensure that the density of transplants and the number of seedlings in the plots are identical. The construction method comprises the following steps: A, selecting the test field; B, setting the plots; C, constructing the plots; D, applying fertilizers to the plots; F, raising and transplanting seedlings; G, irrigating the plots; H, intertilling and weeding; I, controlling pest; J, harvesting rice; H, sampling soil and ground water. The test plots are simple in structure and low in construction cost, and the cross flow of water and nutrients among the plots are effectively avoided. Therefore, the construction method is suitable for various field plot trials of short-term and long-term fertilizer application, agricultural chemicals, varieties, irrigation, cultivation, discharge of greenhouse gasses, and runoff and leaching loss of nitrogen and phosphorus nutrients.
Owner:INST OF SUBTROPICAL AGRI CHINESE ACAD OF SCI

Road pavement drainage structure and construction method thereof

The invention relates to the technical field of road drainage, and particularly relates to a road pavement drainage structure and a construction method thereof. According to the technical scheme, theroad pavement drainage structure is characterized by comprising a road body and a drainage pipeline, wherein the road body comprises a lane and a sidewalk; a drainage well is arranged on the side, close to the sidewalk, of the lane; a drainage grating is arranged at a well opening of the drainage well; the drainage pipeline communicates with the lower end of the drainage well; a sewage collectionwell communicating with the ground is arranged on one side of the sidewalk; a cover plate is arranged at the sewage collection well in a sliding mode; a sewage discharge hole is formed in the drainagewell; a collection frame is contained at the well bottom of the sewage collection well; a mounting plate is arranged on the inner side wall of the sewage collection well; the mounting plate rotationally bears a rotating shaft; the rotating shaft is fixedly sleeved with a wire wheel; a steel wire rope is wound around the wire wheel; a lifting hook is arranged at the free end of the steel wire rope; and a hanging piece is fixedly connected to the collection frame. Sewage discharged by municipal roads can be effectively filtered, filtered garbage is collected and treated, and then the situationthat the drainage pipeline is blocked is reduced.
Owner:佛山市禅鸿建设工程有限公司

Handrail strap speed measuring device of escalator or moving pavement

ActiveCN102838034ANot easy to damageOvercoming elastic resilienceEscalatorsControl theoryFootpath
The invention discloses a handrail strap speed measuring device of an escalator or a moving pavement, wherein a supporting plate is rotatablely arranged on a fixed bottom plate; a non-metal speed measuring wheel is arranged on an end part of the supporting plate; an elastic member is arranged between the other end part of the supporting plate and the fixed bottom plate; thus, when the speed measuring wheel operates on a tight side of the handrail strap, the speed measuring wheel is stressed by pressure of the handrail strap on the tight side to rotate downwards on the supporting plate and is prevented from being easily damaged due to overlarge stressing, and meanwhile, the handrail strap of the tight side is tightly pressed on a circumferential surface of the speed measuring wheel by means of elastic acting force of the elastic member; when the speed measuring wheel operates on a loose side of the handrail strap, the stressing of the speed measuring wheel is weakened, the speed measuring wheel rotates upwards on the supporting plate so that the handrail strap on the loose side can also be tightly pressed on the circumferential surface of the speed measuring wheel under the action of elastic restoring force of the elastic member, the height can be automatically adjusted by the speed measuring wheel according to an operation track of the handrail strap, and frictional operation of the handrail strap is guaranteed all the time to guarantee that a probe smoothly detects a signal and the escalator or the moving pavement can normally work; and the stress of the speed measuring wheel is not overlarge and the speed measuring wheel is not easily damaged.
Owner:SJEC CORP

Optimize system for urban trunk road cross-sections and rainwater treatment method

The invention discloses an optimize system for urban trunk road cross-sections, which comprises a medial strip, a motorway, a non-motorized strip, a non-motorized vehicle lane, a concave green belt and a sidewalk in sequence, wherein a rainwater garden, a first grass planting shallow trench, a gravel pool and a sand setting rainwater inlet are arranged in the non-motorized strip; first vertical curbstones are respectively arranged on two sides of the medial strip; a second grass planting shallow trench is formed in the medial strip close to the vertical curbstones; an intermittent gap vertical curbstone is arranged on one side, close to the motorway, of the non-motorized strip; a first flat curbstone is arranged at a gap of the intermittent gap vertical curbstone to form a rainwater inlet; a punching, seeping and discharging pipe and a first overflow port are arranged in the rainwater garden; a rainwater connecting pipe is arranged below the non-motorized vehicle lane and is in mutual communication with a municipal rainwater pipeline; the rainwater treatment method comprises the following steps: runoff rainwater treatment in the motorway and runoff rainwater treatment in the sidewalk and the non-motorized vehicle lane. The runoff rainwater treatment in the motorway comprises the following steps: precipitating, filtering, concentrating and discharging.
Owner:JIAXING PLANNING & RES INST

Urban road rainwater recycling method and system

ActiveCN107386418AReduce usageRealize small-scale "South-to-North Water Diversion"Sewerage structuresGeneral water supply conservationWater storage tankEngineering
The invention provides an urban road rainwater recycling method and system. In consideration of the extent of pollution to rainwater of the road surface of roadways and sidewalk roads, rainwater collection is divided into two steps, the rainwater on the sidewalk roads is collected by the aid of a semi-closed storage area, a controller is used for controlling supplementing of groundwater when the groundwater level is low, and the clean rainwater is directly collected in a cleaned-water storage tank when the groundwater level is high; for the rainwater on the roadways and in consideration of the extent of pollution to the rainwater divided, the rainwater is divided into first rainwater and subsequent rainwater by the aid of rainwater diversion areas, the first rainwater is collected to a sewage treatment area for treatment prior to being collected to a cleaned-water storage area, the subsequent rainwater is directed used for irrigating greenbelts prior to being filtered and purified via shallow trenches and seepage channels under the greenbelts to be collected to the cleaned-water storage area. The extent of pollution of the rainwater in different areas and periods is fully considered, different treatments are performed, use of detergents can be greatly reduced, energy conservation and environment friendliness are achieved, and the rainwater is recycled maximumly.
Owner:CHINA UNIV OF GEOSCIENCES (WUHAN)

Pavement drainage system capable of realizing automatic opening and closing

The invention discloses a pavement drainage system capable of realizing automatic opening and closing, which comprises a pavement. A water outlet pipeline is arranged in the pavement; spraying equipment is arranged on the upper side of the water outlet pipeline; a water inlet space is formed in the right side of the pavement; a communicating space is formed in the lower side of the water inlet space; a sundry blocking space is formed in the lower side of the communicating space; a water storage space is formed in the lower side of the sundry blocking space. The manhole cover can be in a normally closed state under the condition of no rainfall or no accumulated water on the pavement; pedestrian articles can be effectively prevented from falling into the manhole cover, rainwater enters the water pipe after precipitation, rainwater can be collected, the collected rainwater can be sprayed to the pavement in dry weather, fallen leaves and other sundries can be cleaned to the conveying beltand conveyed out of a pipe network, water pipe blockage is effectively prevented, the anti-skid pavement can be automatically lifted in heavy rain, the friction coefficient of the sidewalk is increased, and pedestrians are prevented from slipping down in walking.
Owner:绍兴夏鸥科技有限公司

Rail transit station connection facility supply and demand balance optimization and adjustment method

The present invention discloses a rail transit station connection facility supply and demand balance optimization and adjustment method. The method comprises the steps of: obtaining traffic connectiontravel demand passenger flow prediction amount according to the get-in passenger flow and exit passenger flow in peak hour of each characteristic year of a predicted rail transit station, and according to the land controlled planning around the stations, determining the connection land total amount; constructing a resident distribution model and each travel mode network; solving the travel probability of each travel mode of each circle layer and the travel probability of each circle layer; solving the connection passenger flow volume of each travel mode and lands required by each travel modeconnection facility; and performing connection facility configuration optimization and adjustment according to the connection facility loading rate of each travel mode, the connection passenger flow volume, the connection facility land, the planning land, the footpath width, the number of bus lines and the number of non-motor vehicle parking stalls. The rail transit station connection facility supply and demand balance optimization and adjustment method makes up the technical defects that a current connection facility is difficult to perform quantitative optimization and adjustment to guide the rail transit designers to quantitatively adjust the connection facility supply or optimize the traffic travel network.
Owner:JIANGSU PROVINCIAL COMM PLANNING & DESIGN INST +1

Gallery bridge type multifunctional skywalk

The invention relates to a gallery bridge type multifunctional skywalk. On the basis of the principle, the strong bearing supporting and the space spanning capability of a steel frame structure is utilized, space occupied by a sidewalk is comprehensively developed, the personnel passing function is reserved, and meanwhile a solar photovoltaic power station is integrally constructed. The gallery bridge type multifunctional skywalk is characterized by comprising a steel frame supporting structure, a gallery-shaped pedestrian path frame, steel structure vertical stairs, an inner and outer auxiliary structure and a solar photovoltaic power generation system. The steel frame supporting structure is a main supporting structure, the gallery-shaped pedestrian path frame is erected on the steel frame supporting structure, a solar photovoltaic module array is arranged on the top of the frame, and steel structure stairs, the inner and outer auxiliary structure and a current control are supplemented with to be combined to form the skywalk which is similar to a gallery bridge in appearance and has the functions of parking, vehicle driving, power generation and the like. A new method is provided for urban construction, urban redevelopment and solar photovoltaic power station construction.
Owner:郑东武
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products