Unlock instant, AI-driven research and patent intelligence for your innovation.

Data scheduling method and device and storage medium

A technology with data scheduling, waiting to be adjusted, applied in wireless communication, using the return channel for error prevention/detection, electrical components and other directions, which can solve the problem of base station scheduling constraints, to achieve the effect of increasing flexibility and avoiding HPN conflicts.

Pending Publication Date: 2022-07-29
DATANG MOBILE COMM EQUIP CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The maximum number A of data transmission blocks that can be scheduled by each DCI (Downlink Control Information, downlink control information) is configured by the upper layer (such as A=8 or 4). Physical Uplink Shared Channel) HPN (HARQ process number or Harq process ID, hybrid automatic repeat request process identifi

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Data scheduling method and device and storage medium
  • Data scheduling method and device and storage medium
  • Data scheduling method and device and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0094] The term "and / or" in the embodiments of the present application describes the association relationship of associated objects, and indicates that three relationships can exist. For example, A and / or B can indicate that A exists alone, A and B exist simultaneously, and B exists alone these three situations. The character " / " generally indicates that the related objects are an "or" relationship.

[0095] In the embodiments of the present application, the term "plurality" refers to two or more than two, and other quantifiers are similar.

[0096] The terms "first", "second" and the like in the description and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It is to be understood that the data so used are interchangeable under appropriate circumstances so that the embodiments of the present application can be practiced in sequences other than those illustrated or described herein, and "fir...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The embodiment of the invention provides a data scheduling method and device and a storage medium, and the method comprises the steps: transmitting first scheduling indication information to a terminal, the first scheduling indication information being used for indicating the terminal to transmit or receive a to-be-scheduled first data transmission block; wherein the HPN (Hybrid Automatic Repeat Request) process identifiers corresponding to the first data transmission blocks to be scheduled are discontinuous. According to the embodiment of the invention, the terminal is indicated to send or receive the first data transmission block with discontinuous HPN through the first scheduling indication information, so that multi-data scheduling of discontinuous HPN numbers is realized, the scheduling flexibility of a base station is improved, and the defect of HPN number conflict in a special scene is avoided.

Description

technical field [0001] The present application relates to the field of communication technologies, and in particular, to a data scheduling method, device, and storage medium. Background technique [0002] The maximum number of data transmission blocks A (such as A=8 or 4) that can be scheduled for each DCI (Downlink Control Information, downlink control information) is configured by the upper layer. Physical Uplink Shared Channel) transmits the HPN (HARQ process number or Harq process ID, hybrid automatic repeat request process identifier) ​​of the data transmission block, and the HPN number of all subsequent data transmission blocks is incremented by 1, that is, multiple data transmission blocks. The scheduled HPN can only be continuous, and this continuous HPN scheduling mechanism will impose great constraints on the scheduling of the base station. SUMMARY OF THE INVENTION [0003] The embodiments of the present application provide a data scheduling method, apparatus, d...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H04W72/04H04L1/16H04L1/18
CPCH04L1/1607H04L1/1812H04W72/23
Inventor 王俊伟
Owner DATANG MOBILE COMM EQUIP CO LTD