A crescent-shaped artificial island technology, applied in the field of crescent-shaped artificial island construction, can solve the problems of environmental impact, high strength of construction materials, large investment, etc., and achieve the effects of reducing investment, saving resources, and convenient operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Example 1. refer to figure 1 . A crescent-shaped artificial island construction method, its steps are as follows:
[0032] (1) In near-shore shallow seas where the water depth does not exceed 30 meters, the positions of the headlands on both sides of the crescent-shaped artificial island are selected according to the design requirements, and the seabed at the positions of the headlands on both sides is dredged; The top is filled with stonework and cement component blocks to form headlands on both sides that are 3 meters above the high tide level;
[0033](2) After forming the headlands on both sides, fill them with bagged sand, connect the inner sides of the two sides of the headlands to form a crescent bay arc; then connect the outer sides of the two sides to form a crescent back arc; The area between the crescent-shaped bay arc and the crescent-shaped back arc is filled, drained, compacted, and raised to a height of 3 meters above the high tide level, forming a cre...
Embodiment 2
[0035] Example 2. refer to figure 1 . A crescent-shaped artificial island construction method, its steps are as follows:
[0036] (1) In near-shore shallow seas where the water depth does not exceed 30 meters, the positions of the headlands on both sides of the crescent-shaped artificial island are selected according to the design requirements, and the seabed at the positions of the headlands on both sides is dredged; Cement component blocks and stonework are used to throw and fill the upper part to form headlands on both sides that are 5 meters above the water surface at high tide;
[0037] (2) After forming the headlands on both sides, fill them with bagged sand, connect the inner sides of the two sides of the headlands to form a crescent bay arc; then connect the outer sides of the two sides to form a crescent back arc; The area between the crescent-shaped bay arc and the crescent-shaped back arc is filled, drained, compacted, and raised to a height of 5 meters above the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com