Rock landslip waterpower starting indoor simulation test method
A technology of simulation test and start-up room, which is applied in the field of simulation test of the inoculation start-up process, can solve the problems of complex model test, difficulty in ensuring the sameness, time-consuming and troublesome, etc., and achieve the effect of uniform force
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0015] ①. A rock specimen containing a submerged slip surface was taken at the site of a rocky slope in the Emei Base of China Railway Southwest Institute. The test specimen is 39cm in length and 29cm in width, and the thickness of the submerged slip surface and the lower rock block are 10cm each.
[0016] ②, see figure 1 , The rock specimen obtained on site is bounded by the submerged slip surface 10, the lower rock block 9 is put into the sample box 2, and the gap between the rock block and the sample box is filled with cement mortar 13, and the upper rock block 8 Put it into the sample frame 1, fill the gap between the rock block and the sample frame with cement mortar 13, and flatten the top surface of the test piece with fine sand.
[0017] ③. After the rock specimen obtained in step ② is solidified, place it on the base support 3 of the test equipment. The bottom of the front end of the lower sample box 2 is limited by the limit stop 4 fixed on the base support 3, and it is p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap