Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for building bushing perforation fracturing-type artificial natural gas migration passage between gas reservoirs

A technology for migration channels and gas reservoirs, which is used in earth-moving drilling, wellbore/well components, and production fluids, etc. It can solve the problems of increased investment in drilling, completion and production facilities, affecting economic benefits, and large investment, and saving Investment and operating costs, enhanced economic recovery, and improved economic benefits

Inactive Publication Date: 2014-11-26
CHINA NAT OFFSHORE OIL CORP +1
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] 1) Drilling and development of new production platforms or underwater production systems. From the construction of new production platforms or underwater production systems to production, the cycle is long and the investment is large. It is difficult to realize the small-scale development in or around the offshore developed gas fields Gas reservoirs or abnormally high pressure gas reservoirs or low permeability gas reservoirs or high CO content 2 The economical and effective development of gas reservoirs will also cause the existing well pattern and existing production facilities of the developed gas field production platform or subsea production system to be unusable
[0006] 2) There are no remaining well slots on the production platform of the developed gas field or no remaining underwater wellheads in the underwater production system, and it is impossible to add well slots or increase underwater wellheads, or directly drill from the established production platform or underwater production system due to the development When economic and technical reasons cannot be realized, the selected small-scale gas reservoirs to be developed or abnormally high-pressure gas reservoirs or low-permeability gas reservoirs or high CO content 2 The reserves of gas reservoirs will not be developed, and the country's precious natural gas resources will be wasted
[0008]4) The development of abnormally high-pressure gas reservoirs and high CO2 gas reservoirs requires very high pressure safety levels and anti-corrosion requirements for relevant materials. High, resulting in a substantial increase in investment in drilling and completion and production facilities, seriously affecting economic benefits

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for building bushing perforation fracturing-type artificial natural gas migration passage between gas reservoirs
  • Method for building bushing perforation fracturing-type artificial natural gas migration passage between gas reservoirs

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] like figure 1 As shown, the method for establishing casing perforation and fracturing artificial natural gas migration channels between gas reservoirs includes the following steps:

[0033] 1) In the middle and early stage of the development of the developed offshore gas field, the physical property of the reservoir sand body is selected from the gas field. According to the distribution range of body space and the drilling capacity of drilling ship 9, select the undeveloped gas reservoir 1 suitable for the development of the present invention in or around the developed gas field, that is, small-scale gas reservoir or abnormally high pressure gas reservoir or low permeability gas reservoir or high CO content 2 Gas reservoir;

[0034] 2) According to the selected gas reservoirs to be developed 1 above, that is, small-scale gas reservoirs or abnormally high-pressure gas reservoirs or low-permeability gas reservoirs or high CO content 2 The spatial relationship between t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for building a bushing perforation fracturing-type artificial natural gas migration passage between gas reservoirs, and the method is characterized by comprising the following steps of selecting a gas reservoir to be developed; building a construction well; forming an uncased hole between the selected gas reservoir to be developed and a production gas reservoir of a developed gas field; loading a bushing into the uncased hole on two gas reservoir well sections; utilizing cement for well cementing of an annular well section between the uncased hole and the loaded bushing; forming a perforation hole on the reservoir well section of the bushing well section by utilizing a perforation gun; fracturing a reservoir section in the two gas reservoir storage layer well sections after the perforation of the bushing well section to form a fracturing crack; and setting a bridge plug above or in front of the two gas reservoir well sections to seal, so that the migration passage is formed. By adopting the development method, the migration passage is conveniently built between the reservoir sands of the production gas reservoir of the developed gas field and the selected gas reservoir to be developed, and economy and efficiency in development of the selected gas reservoir to be developed inside or surrounding the developed offshore gas field can be realized.

Description

technical field [0001] The invention relates to a method for developing natural gas, in particular to a method for establishing casing perforation and fracturing artificial migration channels between gas reservoirs. Background technique [0002] In or around the developed gas fields in the western South China Sea, there are many small-scale gas reservoirs, abnormally high-pressure gas reservoirs, low-permeability gas reservoirs and high CO content 2 The gas reservoir has not been put into development yet, and its overall reserves are large. Because among the above four gas pools to be developed selected by the present invention, small-scale gas pool development has less recoverable gas volume and offshore drilling and completion investment is relatively high; abnormally high pressure gas pool development has high safety requirements and low permeability gas pools Low production capacity requires drilling more wells and reforming reservoirs, high CO content 2 The develo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21B43/01E21B43/25E21B43/30E21B43/26
Inventor 谢玉洪马勇新马文宏邓玄刘鹏超
Owner CHINA NAT OFFSHORE OIL CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products