Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

31results about How to "Reduce well completion costs" patented technology

Tool and method for injecting cement into top of horizontal well screen pipe without drilling and plugging

Provided are a tool and a method for injecting cement into the top of a horizontal well screen pipe without drilling and plugging. The tool for injecting the cement into the top of the horizontal well screen pipe without drilling and plugging is composed of a drilling-free and plugging-free tool, a bumping pressing rubber plug and a fishing tool. During construction, the drilling-free tool is lowered to the well along with a sleeve bunch. A well mouth is pressurized, a packer is sealed through expansion, pressurization is continued, a starting piston is opened, circulation is built, and well cementation is conducted normally. The bumping pressing rubber plug is added for bumping pressing at the later stage of the well cementation, the piston is closed simultaneously, a circulation channel is closed, and the well cementation is finished. After cement curing is finished, fishing is conducted through a small drill pipe connected with a fishing anchor, the small drill pipe and the fishing anchor are lifted after being in place, slips are opened, a fishing drum is blocked, an internal structure of the drilling-free tool is lifted together, and construction is finished. During a working process, a well completion accessory used in the process is not affected by drilling and grinding, service life is greatly prolonged, diameter in a well completion pipe column is large, the inner surface of the well completion pipe column is smooth, and smooth implementation of acid washing and gravel packing is guaranteed. Well completion working time of a single well is reduced by 24 hours on average, and well completion cost is greatly saved.
Owner:CHINA PETROCHEMICAL CORP +1

Horizontal production-injection well completion structure possessing flow control function

ActiveCN101338660AWith flow control functionReduce trafficFluid removalStructural engineeringInjection well
The present invention relates to a horizontal injection-production well completion structure with flow control function. The horizontal injection-production well completion structure comprises a well wall and a flow control filter. The well wall consists of a rising section and a horizontal section. The flow control filter is arranged in the horizontal section of the well wall and is fixedly connected with the well wall. A cavity between the flow control filter and the well wall is filled with glass hollow particles. The horizontal injection-production well completion structure with the flow control function of the present invention has the characteristics of being easy for realizing, low well completion cost and strong function for axial anti-fluid-channeling.
Owner:ANTON BAILIN OILFIELD TECH (BEIJING) CO LTD

Small-sized soluble bridge plug

The invention relates to a small-sized soluble bridge plug. The small-sized soluble bridge plug comprises a central pipe and a compression sleeve sleeving the upper end of the central pipe and used for compressing a rubber cylinder; a limited C-shaped ring is sandwiched between the compression sleeve and the central pipe; the compression sleeve and the limited C-shaped ring are clamped and fixed by threads; the outer side wall of the central pipe is provided with a thread-like continuous protrusion along the compressed traveling direction of a compression assembly; the inner wall of the limited C-shaped ring is provided with a thread-like continuous groove engaged with the thread-like continuous protrusion. Compared with a traditional double-slip bridge plug, the matched structure of the compression sleeve and the limited C-shaped ring is fixed without expansion produced by relative movements of two components of an existing slip assembly, a setting stroke is greatly decreased, and setting by cable pumping is allowed; in addition, due to the omittion of one slip assembly, the use area on the central pipe is saved, rubber cylinder lengthening design is allowed, and accordingly the expansion degree of the rubber cylinder and improvement of setting capability with expansion increase are ensured.
Owner:四川长宁天然气开发有限责任公司 +1

Cement-free well cementation method for horizontal section of horizontal well

The invention relates to a cement-free well cementation method for a horizontal section of a horizontal well. The cement-free well cementation method the step of constructing a well completion system structural pipe string of a horizontal section sleeve fixing tool; delivering the constructed pipe string to the bottom of an oil-gas well, performing mud circulation, starting the sleeve fixing tool, effectively fixing a sleeve and the well wall, and establishing internal circulation of the well; throwing balls into the well, building and testing the pressure, increasing and stabilizing the pressure until a packer inflatable channel in a non-drilling plug tool is open, and inflating and sealing the packer; increasing and stabilizing the pressure until the packer inflatable channel is closed; increasing the pressure until a cement injection channel is opened; delivering a well cementation rubber plug to a close seat of the non-drilling plug tool, and closing the cement injection channel; and salvaging the inner cylinder of the non-drilling plug tool, matching accessories and the well cementation rubber plug to complete the whole construction process. By using the method, the construction process can be simplified, the working cycle can be shortened, and the well completion cost is reduced.
Owner:CHINA PETROCHEMICAL CORP +1

Horizontal well production monitoring and intelligent control integrated well completion tool and using method

InactiveCN110206532AAdjustable control is flexible and safe and reliableInflow profile equalizationSurveyDrilling rodsEngineeringProduction string
The invention relates to a horizontal well production monitoring and intelligent control integrated well completion tool and a using method. The horizontal well production monitoring and intelligent control integrated well completion tool is characterized by comprising an upper connector, a lower connector, an electric control short section, a regulation and control short section and a monitoringshort section, wherein one end of the electric control short section is movably connected with the upper connector, and the other end of the electric control short section is movably connected with one end of a conversion connector; one end of the regulation and control short section is movably connected with the other end of the conversion connector, and the other end of the regulation and control short section is movably connected with one end of a double male connector; and one end of the monitoring short section is connected with the other end of the double male connector, and the other end of the monitoring short section is connected with the lower connector. According to the horizontal well production monitoring and intelligent control integrated well completion tool, the upper connector and the lower connector are separately connected with a production tubular column and lowered into a preset position for fracturing and production, other special lowering tools are not required,the upper connector and the lower connector are not limited by well depth and horizontal segment length, the operation risk is reduced, and the well completion cost is saved.
Owner:CHINA NAT OFFSHORE OIL CORP +1

Method for developing low-permeability gas reservoir

The invention discloses a method for developing a low-permeability gas reservoir, which comprises the following steps: positioning a drilling ship on a sea for well drilling and well completion, establishing a synthetic natural gas migration channel between a production gas reservoir sand body of a developed gas field and a selected to-be-developed low-permeability gas reservoir and combining with a fracturing technology; utilizing the production gas reservoir sand body as a transporting layer and fully utilizing a production platform of the developed gas field or the existing well network of the production gas reservoir of an underwater production system to realize the development of the developed gas field on the sea or the low-permeability gas reservoir on the periphery of the developed gas field so as to reduce the well drilling quantity and the well completion period and reduce the well drilling and well completion expenses. The method has the benefits that well drilling and well completion operation procedures and a well completion tube string structure are simplified, the operation difficulty and the workload are reduced, and the cost is greatly reduced; and by adopting the method, a residual well slot or a residual underwater wellhead is not required, a well slot or a underwater wellhead is not required to be additionally arranged, and a production platform or a underwater production system is not required to be newly built, so that the development investment is greatly reduced, and the economic benefit is greatly improved.
Owner:CHINA NAT OFFSHORE OIL CORP +1

Drilling-plug-free cementing device for full hole completion

InactiveCN104895527AProcess stabilityAchieving annulus containmentSealing/packingWell drillingEngineering
The invention provides a drilling-plug-free cementing device for full hole completion. The device comprises a body, a closing hole sleeve, a rubber plug sleeve and an opening hole sleeve. The lower end of the body is connected with a lower joint, and a plurality of circulation holes are formed in the body circumferentially. The closing hole sleeve is arranged in the body in a penetrating mode and disposed above the circulation holes. The rubber sleeve plug penetrates the closing hole sleeve and a lower joint, the upper end of the rubber sleeve plug is connected with the closing hole sleeve through a first cutting pin, the lower end is connected with the lower joint through a second cutting pin, a plurality of through holes are formed in the closing plug sleeve circumferentially and are aligned and communicated with the circulation holes. The opening hole sleeve is arranged in the closing plug sleeve in a penetrating mode and is connected with the rubber plug sleeve above the plurality of the through holes through a third cutting pin. By means of the device, the structure is simple and reasonable, the device is safe and reliable, the machining cost is low, drill plugs or fishing tools are not needed to be dropped after well cementation, the well drilling completion process is simplified, and the well drilling completion cost is saved.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

High accuracy oriented perforator

The invention relates to a high accuracy oriented perforator which comprises a perforating gun head, a regulation ring, a location locking ring, an upper perforating gun body, an oriented middle upper joint, an oriented middle lower joint, a lower perforating gun body, a perforating gun tail and a corrugated spring. Compared with the prior art, the invention has the advantages of simple structureand convenient use, and can accurately fix the perforation direction and position in any direction and on any position, enhance the productivity, prevent sand production and lower the well completioncost.
Owner:中石化石油工程技术服务有限公司 +2

Tracer water exploration and segmented water control system and method

The invention discloses a tracer water exploration and segmented water control system and method. The tracer water exploration and segmented water control system comprises a tracer water exploration tubular column and a segmented water control tubular column arranged inside the tracer water exploration tubular column. The tracer water exploration tubular column comprises a plurality of expansion packers used for dividing a reservoir of a horizontal well into a plurality of water control sections, and tracer agent screen tubes used for obtaining oil and water information of each water control section. The adjacent expansion packers are connected by the tracer agent screen tubes. The segmented water control tubular column comprises a plurality of isolating and sealing nipples used for sealing the multiple water control sections in a segmented mode to form a plurality of sealed sections, and water control valve nipples used for water-controlled oil mining in the sealed sections. The adjacent isolating and sealing nipples are connected by the water control valve nipples. According to the embodiment, a water outlet layer is determined in a manner that the tracer water exploration tubular column conducts segmented tracer water exploration on the reservoir; and the multiple water control sections are subjected to segmented sealing and water-controlled oil mining through the segmentedwater control tubular column lowered inside the tracer water exploration tubular column, so that the efficiency of water exploration and water control is enhanced.
Owner:CHINA OILFIELD SERVICES

Fracturing and sand prevention pipe column and fracturing and sand prevention method

The invention provides a fracturing and sand prevention pipe column and a fracturing and sand prevention method. The fracturing and sand prevention pipe column comprises a casing pipe and an oil pipearranged in the casing pipe, an annular space is formed between the casing pipe and the oil pipe, a fracturing packer is arranged on the oil pipe, a ball seat and a sand prevention sieve pipe are arranged in the bottom end of the oil pipe in a sleeved mode, the ball seat is in threaded connection with the upper part of the sand prevention sieve pipe, the bottom end of the oil pipe is connected with a limiting device, the limiting device is located on the lower part of the sand prevention sieve pipe, and the length of the sand prevention sieve pipe is greater than the thickness of a reservoir by 20 to 30 meters; a female buckle is arranged at the top end of the sand prevention sieve pipe, and a limiting groove is formed in the limiting device; when a soluble ball is put to strike the ball seat, the ball seat drives the sand prevention sieve pipe to move downwards until the female buckle is clamped in the limiting groove; and after the sand prevention sieve pipe is in place, still standing is conducted for 48 hours, and the soluble ball is dissolved. According to the fracturing and sand prevention pipe column, under the situation of not conducting secondary well completion, it can beensured that stratum sand and fracturing sand do not flow back from a stratum, and fracturing and sand prevention is integrated.
Owner:PETROCHINA CO LTD

Exploiting device and method for horizontal well of coalbed methane

The invention relates to the field of exploiting of coalbed methane, in particular to an exploiting device and method for a horizontal well of coalbed methane. The device comprises a sifting pipe, a casing pipe and a connecting assembly; the sifting pipe is put into the position of the horizontal well of a coalbed; the casing pipe is connected with the sifting pipe, and put into the position of aplumb shaft section; the connecting assembly is connected with the sifting pipe and the casing pipe, and comprises a packing device and salvageable interior accessories, the packing device is connected with a shell, and the shell is connected with the casing pipe through a connecting device; the packing device is used for abutting against the well wall after expanding. According to the device andmethod, during well completion, the sifting pipe is put into the horizontal well of the coalbed, the coalbed methane is collected through the sifting pipe, and the casing pipe is put into the interference stratum above the coalbed; meanwhile, the casing pipe and the annulus band of the well wall are sealed in a well cementation mode, so that the situation that development of the coalbed methane isinterfered by the interference stratum; meanwhile, normal well completion of the plumb shaft section can be achieved, lossless work of the coalbed of the horizontal section can also be guaranteed, and the requirement for efficient development of the coalbed methane is completely met.
Owner:德州众凯石油科技有限公司 +1

Development method of offshore small-scale gas reservoir

InactiveCN102900402ACost-effective developmentSave development investmentFluid removalWell drillingProcess engineering
The invention discloses a development method of an offshore small-scale gas reservoir. The method is characterized by comprising the following steps of: (A) selecting a developed gas field production gas reservoir, and selecting a small-scale gas reservoir to be developed, which is suitable to be developed by adopting the method, in the gas field or around the gas field; (B) selecting a proper offshore position for a drilling ship for taking the place, and establishing an artificial natural gas migration channel between a gas reservoir sand body of the developed gas field production gas reservoir and a small-scale gas reservoir through well drilling and well completion so as to develop the small-scale gas reservoir; and (C) developing the gas reservoir by utilizing a production platform of the developed gas field production gas reservoir or an underwater production system, wherein natural gas in the small-scale gas reservoir enters the gas reservoir sand body of the developed gas field production gas reservoir through the artificial natural gas migration channel under the action of pressure difference, flows to a production well of the production platform or the underwater production system by taking the gas reservoir sand body as a conduction layer and finally flows out of the production well of the production platform or the underwater production system so as to realize the development to the small-scale gas reservoir. According to the development method, through establishing the artificial natural gas migration channel, the traditional development platform or the underwater production system is sufficiently utilized so as to shorten the development period and reduce the investment cost.
Owner:CHINA NAT OFFSHORE OIL CORP +1

Drill-free ball seat

PendingCN107091065ARealize rebateEasy to sit and hangSealing/packingWell cementingEngineering
The invention relates to the technical field of cementing tools, and provides a drill-free ball seat. The drill-free ball seat comprises a ball seat body, a pawl sleeve, a shear pin and a lower joint; the outer side of the lower portion of the ball seat body and the inner side of the upper portion of the lower joint are fixedly mounted together; the pawl sleeve comprises a claw flap section and an annular section sequentially distributed from top to bottom; the claw flap section is separated by a longitudinal groove distributed along the circumference to form at least two pawl flaps; the bottom end of each of the pawl flaps and the top surface of the annular section at the corresponding position are fixed together; the outer side of the upper end of each of the pawl flaps is fixedly provided with a limit protruding block. The drill-free ball seat is reasonable and compact in structure, and can achieve sealing through a sealing ball, and can also restore the normal diameter by pressing to ensure the normal and continuous operation of follow-up operations. The whole process does not require drilling and milling operations, can reduce the wear on sleeve tube inner walls, and is time-saving, effort-saving, convenient and quick; the construction efficiency can be effectively improved, the cost of well completing is reduced, and the security risks caused by the multi-process are reduced.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

Method for building bushing perforation fracturing-type artificial natural gas migration passage between gas reservoirs

The invention discloses a method for building a bushing perforation fracturing-type artificial natural gas migration passage between gas reservoirs, and the method is characterized by comprising the following steps of selecting a gas reservoir to be developed; building a construction well; forming an uncased hole between the selected gas reservoir to be developed and a production gas reservoir of a developed gas field; loading a bushing into the uncased hole on two gas reservoir well sections; utilizing cement for well cementing of an annular well section between the uncased hole and the loaded bushing; forming a perforation hole on the reservoir well section of the bushing well section by utilizing a perforation gun; fracturing a reservoir section in the two gas reservoir storage layer well sections after the perforation of the bushing well section to form a fracturing crack; and setting a bridge plug above or in front of the two gas reservoir well sections to seal, so that the migration passage is formed. By adopting the development method, the migration passage is conveniently built between the reservoir sands of the production gas reservoir of the developed gas field and the selected gas reservoir to be developed, and economy and efficiency in development of the selected gas reservoir to be developed inside or surrounding the developed offshore gas field can be realized.
Owner:CHINA NAT OFFSHORE OIL CORP +1

Completion system of oil and gas wells with regulatably controlling flows of formation fluid or filled fluid in divided sections

InactiveCN1322224CEffective separationPurpose of oil controlFluid removalControl flowPorous medium
A finished oil (or gas) well system able to segmentally control the stratum fluid or injected fluid is at least composed of the fluid regulating pipe in the well and the porous medium in the gap between said regulating pipe and well wall. Said fluid regulating pipe has fluid collecting holes, fluid collecting cavities and the flow controllers relative to said fluid collecting holes for regulating the flow of stratum fluid or injected fluid flowing through said fluid collecting hole. It is suitable for the multi-layer oil deposit to pack multiple segments.
Owner:ANTON BAILIN OILFIELD TECH (BEIJING) CO LTD

Integrated oil and gas reservoir protection tool assembly

The invention discloses an integrated oil and gas reservoir protection tool assembly. The integrated oil and gas reservoir protection tool assembly is composed of a working barrel, a running tool, a formation isolation valve, a connection tool, a suspension packer and a switch tool. The working barrel, the formation isolation valve, the connection tool and the suspension packer are integrally connected through threads. The running tool is arranged in the working barrel and penetrates through the formation isolation valve. The lower end of the running tool is connected with the switch tool through threads. The integrated oil and gas reservoir protection tool assembly has the advantages that the integrated oil and gas reservoir protection tool assembly can be put into an oil and gas reservoir along with a sand control pipe pillar and achieve the disengagement function of the running tool, the formation isolation valve and the connection tool; leakage and losses of completion liquid generated in the well completion and workover processes, and thus the oil and gas reservoir is protected from being contaminated; operation efficiency can be improved, the well completion cost is lowered, the difficulty in later workover processing is lowered, and blowout and well kick and other accidents are prevented; the suspension packer and the formation isolation valve are replaced conveniently in the maintenance process.
Owner:CNOOC ENERGY TECH & SERVICES

Method for establishing artificial natural gas migration channel between gas reservoirs

The invention discloses a method for establishing an artificial natural gas migration channel between gas reservoirs. The method comprises the following steps of: selecting a production gas reservoir which has a high permeability in the gas reservoir sand body physical properties, that is to say, the permeability is higher than 10mD, from developed gas fields, meanwhile, selecting a gas reservoir to be developed, which is suitable to be developed by adopting the method, in the gas fields or around the gas fields; establishing a construction well; drilling the selected gas reservoir to be developed and a gas reservoir sand body of a developed gas field production gas reservoir in the construction well to form an open hole; according to the gas reservoir physical characteristics of the gas reservoir to be developed and the production gas reservoir, selecting and determining a sand proof well completion mode of the two gas reservoir well sections, and carrying out sand proof well completion on the two gas reservoir well sections; and after the sand proof well completion, punching bridge plugs on the two gas reservoir well sections or in front of the two gas reservoir well sections, that is to say, establishing the artificial natural gas migration channel between the two gas reservoirs. Due to the adoption of the development method, gas reservoirs to be developed, which are selected in offshore developed gas fields or around the offshore developed gas fields, can be economically and effectively developed.
Owner:CHINA NAT OFFSHORE OIL CORP +1

Method for building inner sieve-tube outer gravel-filled artificial natural gas migration passage

The invention discloses a method for building an inner sieve-tube outer gravel-filled artificial natural gas migration passage, and the method comprises the following steps of selecting a gas reservoir to be developed; building a construction well; forming an uncased hole between the selected gas reservoir to be developed and a production gas reservoir of a developed gas field; loading a bushing into the uncased hole on the two gas reservoir well sections; conducting well cementing between the uncased hole and the loaded bushing by utilizing the cement; forming a perforation hole on two gas reservoir storage well sections in the bushing well section after being cemented by utilizing a perforation gun; loading a sieve tube into the bushing well section, and filling gravels between the bushing and the sieve tube; and setting a bridge plug above or in front of the two gas reservoirs well sections after being filled with the gravels to seal, so that the artificial migration passage is formed. The inner sieve-tube outer gravel-filled artificial natural gas migration passage is conveniently built between the reservoir sand of the production gas reservoir of the developed gas field and the selected gas reservoir to be developed, and the economy and efficiency in development of the selected gas reservoir to be developed inside or surrounding the developed offshore gas field can be realized.
Owner:CHINA NAT OFFSHORE OIL CORP +1

High accuracy oriented perforator

The invention relates to a high accuracy oriented perforator which comprises a perforating gun head, a regulation ring, a location locking ring, an upper perforating gun body, an oriented middle upper joint, an oriented middle lower joint, a lower perforating gun body, a perforating gun tail and a corrugated spring. Compared with the prior art, the invention has the advantages of simple structure and convenient use, and can accurately fix the perforation direction and position in any direction and on any position, enhance the productivity, prevent sand production and lower the well completion cost.
Owner:中石化石油工程技术服务有限公司 +2

A staged fracturing and water control well completion method and a pipe string and downhole sliding sleeve switch system

The invention provides a segmental fracturing and water control completion method, a pipe column and a downhole sliding sleeve switching system, and belongs to the technical field of oil and gas wellcompletion and production. The method includes the following steps that 1, the pipe column is placed, wherein the pipe column is put downwards to a predetermined position, and well cementation or packer pressure holding and sealing; 2, first stage fracturing is performed, wherein pressure holding is performed in a casing pipe, first-stage switch sliding sleeves are opened for fracturing, and afterfracturing, the switch sliding sleeves are kept in an opening state under static pressure by pressure holding; 3, the downhole sliding sleeve switching system is placed, wherein the primary-stage sliding sleeve is closed, the next-stage sliding sleeve is opened, and fracturing is performed; 4, the step 3 is repeated until all stages of fracturing are completed; 5, production is performed, whereinthe downhole sliding sleeve switching system is put downwards, and the switch sliding sleeves of all stages are opened for production; 6, water control is performed, wherein after water comes out from one fracturing segment in the later period, the downhole sliding sleeve switching system is put downwards to close the corresponding switch sliding sleeve, the rest segments continues to be produced, and thus the segmental completion function is achieved.
Owner:中石化石油工程技术服务有限公司 +1

Cement-free cementing method for horizontal section of horizontal well

The invention relates to a cement-free well cementation method for a horizontal section of a horizontal well. The cement-free well cementation method the step of constructing a well completion system structural pipe string of a horizontal section sleeve fixing tool; delivering the constructed pipe string to the bottom of an oil-gas well, performing mud circulation, starting the sleeve fixing tool, effectively fixing a sleeve and the well wall, and establishing internal circulation of the well; throwing balls into the well, building and testing the pressure, increasing and stabilizing the pressure until a packer inflatable channel in a non-drilling plug tool is open, and inflating and sealing the packer; increasing and stabilizing the pressure until the packer inflatable channel is closed; increasing the pressure until a cement injection channel is opened; delivering a well cementation rubber plug to a close seat of the non-drilling plug tool, and closing the cement injection channel; and salvaging the inner cylinder of the non-drilling plug tool, matching accessories and the well cementation rubber plug to complete the whole construction process. By using the method, the construction process can be simplified, the working cycle can be shortened, and the well completion cost is reduced.
Owner:CHINA PETROCHEMICAL CORP +1

Method for building bushing perforation fracturing-type artificial natural gas migration passage between gas reservoirs

The invention discloses a method for building a bushing perforation fracturing-type artificial natural gas migration passage between gas reservoirs, and the method is characterized by comprising the following steps of selecting a gas reservoir to be developed; building a construction well; forming an uncased hole between the selected gas reservoir to be developed and a production gas reservoir of a developed gas field; loading a bushing into the uncased hole on two gas reservoir well sections; utilizing cement for well cementing of an annular well section between the uncased hole and the loaded bushing; forming a perforation hole on the reservoir well section of the bushing well section by utilizing a perforation gun; fracturing a reservoir section in the two gas reservoir storage layer well sections after the perforation of the bushing well section to form a fracturing crack; and setting a bridge plug above or in front of the two gas reservoir well sections to seal, so that the migration passage is formed. By adopting the development method, the migration passage is conveniently built between the reservoir sands of the production gas reservoir of the developed gas field and the selected gas reservoir to be developed, and economy and efficiency in development of the selected gas reservoir to be developed inside or surrounding the developed offshore gas field can be realized.
Owner:CHINA NAT OFFSHORE OIL CORP +1

Acid fracturing and water controlling integrated device, acid fracturing and water controlling tubular column and acid fracturing and water controlling method

The invention provides an acid fracturing and water controlling integrated device which comprises an acid fracturing unit and a water control short section. The acid fracturing unit comprises an acidfracturing base pipe, an outer cylinder and an acid fracturing sliding sleeve. an acid fracturing inner hole is formed in the outer wall of the acid fracturing base pipe, the outer cylinder is mountedoutside the acid fracturing base pipe, an acid injection hole is formed in the outer wall of the outer cylinder, the acid fracturing sliding sleeve is arranged in an annular space between the acid fracturing base pipe and the outer cylinder, and the acid fracturing sliding sleeve is configured to cover the acid injection hole in an initial state and move in an acid injection state to open the acid injection hole, the water control short section is connected with the acid fracturing unit and comprises a water control base pipe and a water control mechanism installed on the water control base pipe, and the water control mechanism only allows fluid in a shaft to flow towards the water control base pipe in a one-way mode. The invention further provides an acid fracturing and water controllingtubular column and an acid fracturing and water controlling method.
Owner:CHINA PETROLEUM & CHEM CORP +1

Method for developing low-permeability gas reservoir

The invention discloses a method for developing a low-permeability gas reservoir, which comprises the following steps: positioning a drilling ship on a sea for well drilling and well completion, establishing a synthetic natural gas migration channel between a production gas reservoir sand body of a developed gas field and a selected to-be-developed low-permeability gas reservoir and combining with a fracturing technology; utilizing the production gas reservoir sand body as a transporting layer and fully utilizing a production platform of the developed gas field or the existing well network of the production gas reservoir of an underwater production system to realize the development of the developed gas field on the sea or the low-permeability gas reservoir on the periphery of the developed gas field so as to reduce the well drilling quantity and the well completion period and reduce the well drilling and well completion expenses. The method has the benefits that well drilling and well completion operation procedures and a well completion tube string structure are simplified, the operation difficulty and the workload are reduced, and the cost is greatly reduced; and by adopting the method, a residual well slot or a residual underwater wellhead is not required, a well slot or a underwater wellhead is not required to be additionally arranged, and a production platform or a underwater production system is not required to be newly built, so that the development investment is greatly reduced, and the economic benefit is greatly improved.
Owner:CHINA NAT OFFSHORE OIL CORP +1

Development method of offshore small-scale gas reservoir

InactiveCN102900402BCost-effective developmentReduce difficultyFluid removalWell drillingProcess engineering
The invention discloses a development method of an offshore small-scale gas reservoir. The method is characterized by comprising the following steps of: (A) selecting a developed gas field production gas reservoir, and selecting a small-scale gas reservoir to be developed, which is suitable to be developed by adopting the method, in the gas field or around the gas field; (B) selecting a proper offshore position for a drilling ship for taking the place, and establishing an artificial natural gas migration channel between a gas reservoir sand body of the developed gas field production gas reservoir and a small-scale gas reservoir through well drilling and well completion so as to develop the small-scale gas reservoir; and (C) developing the gas reservoir by utilizing a production platform of the developed gas field production gas reservoir or an underwater production system, wherein natural gas in the small-scale gas reservoir enters the gas reservoir sand body of the developed gas field production gas reservoir through the artificial natural gas migration channel under the action of pressure difference, flows to a production well of the production platform or the underwater production system by taking the gas reservoir sand body as a conduction layer and finally flows out of the production well of the production platform or the underwater production system so as to realize the development to the small-scale gas reservoir. According to the development method, through establishing the artificial natural gas migration channel, the traditional development platform or the underwater production system is sufficiently utilized so as to shorten the development period and reduce the investment cost.
Owner:CHINA NAT OFFSHORE OIL CORP +1

A pumping retrievable electronically controlled hydraulic cup tool

ActiveCN108999587BFast pumpingImprove well completion timeSealing/packingRubber CupCable transmission
The invention provides a pumping recyclable electronically controlled hydraulic rubber cup tool, and belongs to the technical field of well completion and production of oil and gas wells. The tool includes a power mechanism, a transmission mechanism, a rubber cup and a rubber cup sleeve; the power mechanism is connected to the transmission mechanism; and the transmission mechanism drives the rubber cup to stretch out of the rubber cup sleeve and retract the rubber cup sleeve. Through a combination of a screw nut mechanism and a hydraulic piston mechanism, and the stretching out and retractingof the rubber cup realized by downhole pressure, the rubber cup can open a tight sleeve when going down, so that the convenient and rapid placing of a sectional completion tool by pumping can be realized, and excessive leakage of completion fluid can be avoided. The retracting of the rubber cup can be controlled through cable transmission power signals on ground when a completion string is in place or gets stuck, so that the completion tool can be conveniently lifted by a lifting cable.
Owner:中石化石油工程技术服务有限公司 +1

Soluble bridge plug suitable for high-temperature well conditions

PendingCN112796701AStable structureAvoid dissolution damageSealing/packingEngineeringMechanical engineering
The invention relates to the technical field of structures of soluble bridge plugs, in particular to a soluble bridge plug suitable for high-temperature well conditions. The soluble bridge plug is used for solving the problem of pressure bearing of soluble bridge plugs under high-temperature conditions and comprises a central tube, wherein a spacer ring is arranged at one end of the central tube, an anti-collision ring is arranged at the other end of the central tube, an upper slip, an upper cone, an upper female expansion ring, an upper male expansion ring, an upper rubber sleeve seat, a rubber sleeve, a lower rubber sleeve seat, a lower male expansion ring, a lower female expansion ring, a lower cone and a lower slip are sequentially arranged on the portion, between the spacer ring and the anti-collision ring, of the central tube in a sleeving manner, the upper slip and the lower slip are both of an integral cylindrical slip structure, stress cracks are machined in the inner surface and the outer surface of the upper slip and the inner surface and the outer surface of the lower slip, slip teeth are arranged on the slips, the central tube, the spacer ring, the anti-collision ring, the upper slip, the upper cone, the upper female expansion ring, the upper male expansion ring, the upper rubber sleeve seat, the lower rubber sleeve seat, the lower male expansion ring, the lower female expansion ring, the lower cone and the lower slip are all made of soluble metal, the rubber sleeve is made of soluble rubber, and the slip teeth are made of ceramic. The bridge plug is suitable for high-temperature environment mining.
Owner:SICHUAN WELDON CHEM
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products