On-line management method for project progress payment application

A technology of project management and management method, which is applied in the field of online management of project progress payment application, and can solve problems such as easy errors in payment information management, large randomness of project progress payment, and delay in project payment of construction units.

Active Publication Date: 2013-06-05
BEIJING JIANLONG HEAVY IND GROUP
View PDF2 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Although the Internet-based project progress management method has been realized, the payment of project progress payment is very random, and there are often cases of not paying according to the project progress, defaulting on the project payment of the construction unit or prepaying the project payment in advance, and failing to reserve enough balance as required The situation exists, due to the wide variety of payments, the management of payment information is prone to errors

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • On-line management method for project progress payment application
  • On-line management method for project progress payment application
  • On-line management method for project progress payment application

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0080] see Figure 1 to Figure 3 , the online management method of the project progress payment application of the present embodiment mainly includes a contract management module, a progress assessment module, and a contract payment module;

[0081] The functions of the contract management module include:

[0082] 1. Fill in the basic information of the contract and manage it throughout the contract life cycle;

[0083] 2. Provide the contract to be written according to the template to ensure the standardization of the contract. At the same time, the fields that can be filled in the template and the types of template files can be added and changed according to the actual situation;

[0084] 3. Management of contract changes. After the change, the contract will be accumulated into the original contract according to the changed amount, and the changed amount will be called in the changed payment.

[0085] The functions of the progress assessment module include:

[0086] 1. De...

Embodiment 2

[0134] This embodiment is an improvement made on the basis of Embodiment 1. For the same technical content as Embodiment 1, please refer to the content disclosed in Embodiment 1, and no repeated description will be made here.

[0135] The online management method of project progress payment application in this implementation also includes realizing the association of project progress payment through query, setting a group of payment risk thresholds, receiving a query instruction, and the steps are:

[0136] a. Extract the payment data corresponding to the contract from the contract database according to the instruction;

[0137] b. The payment data is compared with the payment risk threshold, and if it is higher than the risk threshold, a risk reminder is sent;

[0138] c. Output query results;

[0139] The payment data includes advance payment data, temporary loan data, invoice payment data and quality guarantee data.

Embodiment 3

[0141] see Figure 4 , Figure 5 , in this embodiment, an online management method for application for project progress payment, the interactive personnel exchange information according to a remote interactive platform, and the remote interactive platform includes a server-side computer system 1, an application-side computer device 2, at least An audit end computer device 3; the server-end computer system, the application end computer device, and the audit end computer device are in a wide area network environment and realize network connection, and the described wide area network environment is a network domain environment based on INTERNET, and the described The server-side computer system includes a database server 4, a webpage application server 5, and software matching the server-side computer system; the application-end computer device and the review-end computer device are respectively installed with project progress payment management software.

[0142] In this embodi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an on-line management method for project progress payment application. According to the method, based on a remote interaction platform, through data transmission and data processing between an application end computer device, a checking end computer device and a server end computer system, with an electronic contract used as the basis of the payment application, and through establishment of electronic spreadsheets with the four payment application types of advance payment, temporary loan, money guarantee and ticket to payment, true and accurate data support is supplied to paying of project progress payment, on-line management for the project progress payment application is achieved, and efficiency of project management work is improved.

Description

technical field [0001] The present invention relates to an online management method for project progress payment application. The method is based on a remote interactive platform, through data transmission and data processing between the application end computer device, at least one review end computer device and the server end computer system. Online management of progress payment requests. Background technique [0002] There are many types of contracts involved in the project construction process. At the same time, in the process of project progress, contract changes are very frequent, and changes mean opportunities for claims; therefore, the management of project progress payment must be strengthened in project management. Chinese patent 01121134.2 discloses a method for managing the progress of a project. The method for managing the progress of a project transmits project information such as daily reports and project photos to server and save. In the server, the projec...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q30/00
Inventor 栾贺新郑彬华王小红韩志军
Owner BEIJING JIANLONG HEAVY IND GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products