Unlock instant, AI-driven research and patent intelligence for your innovation.

Project Management System Based on Associative Memory

A technology of associating storage and projects, which is applied in the direction of storage system, file system, file system management, etc., and can solve the problems of difficult and time-consuming management of stored information

Active Publication Date: 2021-04-27
THE BOEING CO
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

As the number of research and development projects increases, it can become more difficult and time-consuming to manage information stored in different locations and / or in different formats

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project Management System Based on Associative Memory
  • Project Management System Based on Associative Memory
  • Project Management System Based on Associative Memory

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] Various exemplary embodiments recognize and take into account many different considerations. For example, the different exemplary embodiments recognize and take into account that some currently available systems for managing projects may include performing manual analysis of information for these projects. Manual analysis can be analysis performed by an operator, even if performed computer-assisted. This type of analysis can require more time, effort, cost and resources than desired.

[0026] Further, the various exemplary embodiments recognize and take into account that manual analysis may require an operator with some level of experience or expertise. The amount of time, expense, and / or training required for an operator to acquire this level of experience or expertise may be greater than desired.

[0027] The different exemplary embodiments also recognize and take into account that information for an item may be stored in different storage devices, in different loca...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present disclosure provides methods and apparatus for managing information (116) for a project (106). Information (116) for the item (106) is stored as a data entity (120) in an associative memory (130). The associative memory (130) includes a plurality of data with a plurality of associations, wherein the data entity (120) is included in the plurality of data. The associative memory (130) further includes content addressable structures. The associative memory (130) is configured to be queried based on at least one relationship selected from the group consisting of direct relationships and indirect relationships between the plurality of data. The data entities (120) stored in the associative memory (130) are grouped forming a number of clusters (134). A report is generated using the number of clusters (134).

Description

technical field [0001] This disclosure relates to managing complex or large projects using associative memory. Background technique [0002] Project management is a technology as old as civilization itself. For example, Ancient Egypt managed the project to build the pyramids at Giza. However, in modern times the techniques of project management have been studied and refined in order to increase the efficiency of projects in terms of cost, time, and possibly other parameters. [0003] For example, one business project management strategy known to have been developed in 1986 is SIX SIGMA SIX SIGMA One of several possible goals for a project management strategy is to establish a manufacturing process that produces fewer than 3.4 defects per million product units manufactured. However, SIX SIGMA Just one example of a business management or project management strategy. [0004] Many such strategies exist, and software exists to aid in project management. Further, there ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/06G06F16/11
CPCG06F12/00G06Q10/06
Inventor L·J·夸特西
Owner THE BOEING CO