Assembly process of jq900a bridge erecting machine
A technology of bridge erecting machine and technology, which is applied in the direction of erecting/assembling bridges, bridges, bridge construction, etc., and can solve the problems of long construction mileage, lack of construction equipment, and poor applicability, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] According to attached figure 1 It can be seen that the present invention specifically relates to a JQ900A bridge erecting machine assembly process, which belongs to the technical field of bridge construction.
[0029] The assembly process of JQ900A bridge erecting machine is as follows:
[0030] 1) According to the direction of the beam erection, first assemble the left and right main beams 8 and the supporting platform, and then install the carrying bracket 1 on the beam transporting vehicle and adjust the height through the bracket sleeve 2;
[0031] 2) Adjust the height of the support sleeve 2 so that the cross arm of the carrying support 1 is 2 meters away from the ground, that is, the lower position, and fix the support sleeve 2 with a pin;
[0032] 3) According to the structural shape and size of the main beam 8, mark the landing point position on the bottom surface of the main beam 8 and the bracket ear;
[0033] 4) Through the cooperation of two 70-ton cranes,...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com