Rectifying method by drilling at intervals and pile cutting off
A technology for cutting piles and pile bodies, which is applied in the field of pile cutting and rectification by interval drilling, and can solve problems such as poor controllability, inability to quantitatively control, difficulty in rectifying inclination, and high construction risk
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] In order to further illustrate the technical means and technical effects adopted by the present invention to achieve the intended purpose, the present invention will be further described below in conjunction with specific embodiments and accompanying drawings.
[0022] The method for rectifying and rectifying the rectification of piles at intervals of the present invention is used in a rectification and strengthening project of a certain high-rise residential building, and its specific implementation steps are as follows:
[0023]a. According to the length of the long side of the less sinking side of the inclined building 1 and the difficulty of construction, two vertical shafts 2 are excavated on the outside of the inclined building on the less sinking side of the inclined building 1 (in actual construction, the excavation of 2 to 2 shafts can be selected). 4 shafts), the distance between the two shafts 2 is 15-30 meters; the depth of the shafts 2 is 1.7-2.0 meters belo...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com