On-site construction technology of unconventional CO2 fracturing
An on-site construction, CO2 technology, applied in wellbore/well components, production fluid, earthwork drilling and production, etc., can solve problems affecting the safe and efficient production of CO
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] The present invention will be further described below in conjunction with the accompanying drawings.
[0037] The present invention provides an unconventional CO 2 The on-site construction process of fracturing includes the following steps:
[0038] (1) Preparation of the main fracturing vehicle 3: cleaning of the upper water chamber and the pump cavity of the large pump to prevent the thread of the upper water chamber from being tightly sealed, and the gas phase CO 2 Puncture leak occurred while purging line. Specifically include the following:
[0039] Clean the upper water chamber and large pump chamber of each main fracturing vehicle 3 one day in advance to remove sand and other debris to avoid blocking the pipeline, and at the same time blow dry the water and wipe it. Due to the liquid phase CO 2 The temperature is -18°C. If there is moisture, it will freeze instantly, causing the valve head and valve seat in the large pump to stick together and cannot be separ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com