Reservoir emptying tunnels for super high dams above 200 meters and their layout methods and uses
A technology of ultra-high dams and venting holes, which is used in water conservancy projects, marine engineering, construction, etc. to ensure safety management and emergency disposal, and save resources.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] This embodiment relates to a vent hole for a super-high dam reservoir with a height of more than 200 meters.
[0024] In the mountain body of the super high dam reservoir above 200 meters, there are such figure 1 As shown in the emptying hole, the emptying hole body 31 is arranged in an inverted "U" shape in the mountain body 41, and is used to connect the upstream reservoir and the downstream river; The water outlet 21 is located at the bottom 11 of the upstream reservoir, and a water outlet 22 is provided at the connection between the emptying cavity body 31 and the downstream channel 14, and the elevation of the water inlet 21 is higher than the elevation of the water outlet 22, that is, the height of the water inlet 21 from the sea level is higher than The height of the water outlet 22 from the sea level; the downstream side of the emptying cavity body 31 top is provided with an emptying gate 32, and the elevation difference of the emptying gate 32 from the upstream...
Embodiment 2
[0026] This embodiment relates to a method for arranging the vent hole of a superhigh dam reservoir with a height of more than 200 meters, including the following steps:
[0027] Step 1: Set up a water inlet at the connection between the mountain body and the bottom of the upstream reservoir;
[0028] Step 2: setting a water outlet at the connection between the mountain body and the downstream river, the elevation of the water inlet is higher than the elevation of the water outlet;
[0029] Step 3. Arrange an inverted "U"-shaped venting cavity in the mountain body, and the side wall of the cavity is well sealed;
[0030] Step 4. Set up a venting gate on the downstream side of the top of the venting cavity. It is required that the water pressure generated by the difference between the elevation of the venting gate and the checked flood level of the upstream reservoir cannot be greater than the bearable water pressure of the venting gate;
[0031] Step 5: The hole diameter of t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com